Loading...
Hollows-LR 990220 REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/20/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-9 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. BOIL ID O~MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DRY DENSFrY MOISTURE DRY OENSffY COUPAC~ON COMMENT* % PCF % PCF 59 2/20199 SG I 26.8 92 27.9 91 99 2-A 60 2/20/99 SG 1 26.8 92 27.9 91 99 2-A 61 2/20/99 FG-1.9 2 24.3 95.2 24.9 93 97 1-A 62 2/20/99 FG-2.5 2 24.3 95.2 27.4 92 97 1-A 63 2/20/99 FG-4.8 2 24.3 95.2 25.5 93 98 1-A 64 2/20/99 FG-5.5 2 24.3 95.2 26.9 92 97 1-A 65 2/20/99 FG-5.6 2 24.3 95.2 26.6 93 98 1-A TEST LOCATION: 59 HIDDEN HOLLOW COURT AT STATION ~5+00 60 HIDDEN HOLLOW COURT AT STATION #8+00 61 BLOCK A, PAD 22 62 BLOCK A, PAD 24 · 63 BLOCK A, PAD 26 64 BLOCK A, PAD 28 65 BLOCK A, PAD 30 2. NATURAL SUBGRAOE 8. PERCENT COMPACTION DOE8 NOT COMPLY WITH SPECIFICATIONS (~ MI 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIF3CATIOh~ 4 CEMENT TREATED D. RETEST ~-/~1PHA TE.~T4NG, I!~___~ Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/20199 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-9A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID o~Mu~ MAXIMUM LAB IN PLACI~ IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DflYDENSITY MOISTURE DRYDENSI-~f COMPACTION COMMENT* 96 PCF % PCF 66 2/20/99 FG-5.8 2 24.3 95.2 27.1 92 96 1-A 67 2/20/99 FG-3.3 2 24.3 95.2 28.0 91 96 1-A TEST LOCATION: 66 BLOCK A, PAD 32 67 BLOCK A, PAD 34 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFK:ATIONS 2 NA~JRAL St.J~RAO~ B P~=-RCENT COMPACTION DOES NOT COMI=LY VVITH SPECIFICATIONS Resl~nmll~ ~ Geotechnical Engineering · Construclk)n MateriaJs Testing · Environmental Engir'~'"---.fing · Consulting REPORT OF FIELD ALPHA TESTtNG, tNC. COMPACTION TESTS 2209 Wisconsin St.. Suite 100 Dallas. Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/20/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-8 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID O~nMUM MAXIMUM LAB IN PLACE IN Pt. ACE PERCEI~F NO. DATE DEPTH~ NUMBER MOIb-"RJRE ORY DENSITY MOISTURE DRY DENSrI~ COMPACTION COMMENT* % PCF % PCF 50 2/20199 SG I 26.8 92 28.4 91 98 51 2/20/99 SG I 26.8 92 26.9 91 99 2-A 52 2/20/99 SG I 26.8 92 26.8 92 100 2-A 53 2/20/99 FG 2 24.3 95.2 25.7 91 96 1-A 54 2/20199 FG-1.7 2 24.3 95.2 26.0 91 96 1-A 55 2/20/99 SG/FG 2 24.3 95.2 26.2 91 95 2-A 56 2/20/99 FG 2 24.3 95.2 25.5 91 95 2-A TEST LOCATION: 50 BLOCK A, PAD 59 51 BLOCK A, PAD 57 52 BLOCK A, PAD 55 53 BLOCKB, PAD2 54 BLOCKB, PAD4 55 BLOCKB, PAD6 56 BLOCKB, PAD8 ! FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY VVITH ~PECIFICA?IONS 2. NATURAL ~.IBGRADE B. PERCENT COMPACTION DO~$ NOT COMPLY1/VITH SPECIFICATIONS 3 LIME STABILIZED C PERCENT IN PLACE MO~TURE DOES NOT COMPLY WITH SPE~IFICATtON~ 4 CEMENT TREA~.~D D RETEST Geotechnical Engineering · Construction Moteriols Testing · Environmentol Engineering · Consulting REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St,, Suite 100 Daflas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2~20~99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-8A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID o~nuua MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER ' MOIffillJRE DRY DENSITY MOISTURE DRY DENSffY COMP^CTION COMMENT* % PCF % PCF 57 2/20/99 FG-3.1 2 24.3 95.2 25.3 91 95 1-A 58 2/20/99 FG-2.6 2 24.3 95.2 27.0 90 94 1-B TEST LOCATION: · 57 BLOCKB, PAD9 58 BLOCKB, PAD 9 1.FILL 'e A. IN PLACE PERCENT MOISI'URE AN[) PIERCENT COMPACTION COMPLY WITH SPECiFiCATiONS Ubl~..~ 2 NATURAL SUI~RAI:~ a I=I~CENT COI~P~."13ON I:XX~S NO? COMPLY wrm SPEClFICAllONS ~llyS 3 UME STABILLTED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATK)N$ ' 4 CI=MENT TREATED D RETEST ~~~) Geatechnical Engineering · Construction Materials Tes#ng · Environmental Engineenng · Consulting