Loading...
Hollows-LR 990219 REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-7B COPPELL, TEXAS TEST DATA: TEST '~ ELEV. SOIL ID O~'IMUM MAXIMUM LAB IN PLACE tN I:~..ACE PERCENT NO. DATE DEPTH~ NUMBER MOI~I'URE DRY OENSrTY MOISTURE DRY DENSI'I'Y COMPACTION COMMENT* % PCF % PCF 49 2/19/99 SG I 26.8 92 28.6 90 98 2-A TEST LOCATION: 49 BLOCK A, PAD 61 1 FILL ~'A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WTTI-I SPECIFICATIONS 3.LIME ~FA~ILrZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D RETEST Geotechnical Engineering · Construction Materials Testing · Environmentol Engineering · Consutfing REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAIls': 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19~99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128.4 COPPELL, TEXAS TEST DATA: TEST '~. ELEV. SOIL ID oP'nMUM MAXIMUM !,.~B IN PLACE IN PLACE PERCENT NO. DATE DEPT'~ NUMBER MOISTURE DRY DENsrrY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1 2/19/99 SG 2 23.5 95 24.2 91 96 1-A 2 2/19/99 SG 2 23.5 95 24.1 91 95 1-A 3 2/19/99 FG-3.0 2 23.5 95 24.8 91 95 1 -A 4 2/19~99 FG-3.0 2 23.5 95 25.4 91 95 1 -A 5 2/19/99 FG-2.0 2 23.5 95 23.7 92 97 1-A 6 2/19/99 FG-2.0 2 23.5 95 24.9 92 96 1-A 7 2/19/99 SG 2 23.5 95 25.2 91 96 1-A TEST LOCATION: 1 PAVING - SARA DRIVE AT STATION M:)+'60 2 PAVING - SARA DRIVE AT STATION #1+50 , 3 PAVING-- SARA DRIVE AT STATION #0+60 4 PAVING - SARA DRIVE AT STATION #1+25 5 PAVING - SARA DRIVE AT STATION #1+00 6 PAVING - SARA DRIVE AT STATION fK)+60 7 PAVING - CRESTVlEVV DRIVE AT STATION #5+00 *' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~(~ U1~13~~ I FILL 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~U#y ,,~ 3 MME STAI~ILIZED C PERCENT IN PLACE MOI~"URE DOES NOT COMPLY WTI'H SPECIFICATIONS 4 CEMENT TREATED D RETEST ~~~'~ ~-~otechnicol Engineering · C~ IVIoterioJs Testing · Environmenlol Engineedng · Consulting REPORT OF FIELD ALPHA rESTtNO, tNC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 · · I I TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-4A COPPELL, TEXAS TEST DATA: TEST '~. ELEV. SOIL ID OJ:~'FIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~',,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPAC'T1ON COMMENT* % PCF % PCF 8 2/19/99 SG 2 23.5 95 26.3 91 95 1 -A 9 2/19/99 SG 2 23.5 95 24.5 92 97 1 -A 10 2/19/99 SG 2 23.5 95 25.6 91 96 1-A 11 2/19./99 SG 2 23.5 95 25.1 91 95 1 -A 12 2/19/99 SG 2 23.5 95 25.5 91 96 1-A 13 2/19/99 SG 2 23.5 95 23.5 93 97 1 -A 14 2/19/99 SG 2 23.5 95 24.4 92 96 1-A TEST LOCATION: 8 ALLEY #6 AT STATION #19+50 9 PAVING - HOLLOW RIDGE PLACE AT STATION #2+50 10 PAVING - HIDDEN HOLLOW COURT AT STATION #3+50 11 PAVING - HIDDEN HOLLOW COURT AT STATION #7+50 ' 12 ALLEY #5 AT STATION f~,+00 13 ALLEY ~5 AT STATION #6+00 14 ALLEY #5 AT STATION #9+00 1. FILL * A. IN PLA. CE PERCENT MO~-~TURE AND PERCENT COMPACTION COMPLY' WITH SPECIFICATIONS ~lly S ~'~ 2. NATURAL St. JBGRADE B. PERCENT COMPACTION DOES NOT COMPI. Y ~ SPECIFICAI'IONS 3. LIME STABILIZED C PERCENT IN PLACE_ MOIS~ OOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D RE-rEST ~ AL~I~NG(~. Geotechnical Engineering · Cons#uc~ MaterioJs Testing · Environmental Engineering · Co~sufllng REPORT OF FIELD ALPHA TESTtNG, tNC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dollas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/40~-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19/99 DALLAS, TEXAS PROJECT HOLLOVVS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99126-4B COPPELL, TEXAS TEST DATA: TEST "~ ELEV. SOIL ID Om'~MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENS~'Y COMPACTION COMMENT* 15 2/19/99 SG 2 23.5 95 24.1 92 97 1-A 16 2/19/99 SG 2 23.5 95 25.5 91 95 1-A 17 2/19/99 SG 2 23.5 95 25.0 91 95 1-A 18 2/19/99 SG 2 23.5 95 25.6 91 95 1-A 19 2/19/99 SG 2 23.5 95 26.4 90 95 1-A 20 2/19/99 SG 2 23.5 95 24.8 91 96 1-A 21 2119/99 SG 2 23.5 95 25.2 91 96 1-A TEST LOCATION: 15 ALLEY ~ AT STATION #12+00 16 ALLEY #1 AT STATION #1+00 17 ALLEY #1 AT STATION #3+00 18 ALLEY #1 AT STATION #14+00 19 ALLEY #1 AT STATION #17+00 20 ALLEY #1 AT STATION #20+00 21 ALLEY#2 AT STATION #1+00 1 FILL '* A IN PLACE PERCENT MCNS"FURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUI~GRAD~ B PERCENT COMPAC'rlON DOES NOT COMPLY WTTH SPECIFICATIONS ~~]~ 'lY~~.,~'~ 3 LIME STABILIZED C.PERCENT IN PLACE MOISTURE DOES NOT COMPLY WTTH $1ar=clFICA~$ 4 C~MENTTREATED D RE'rEST ~ ALP.I..r~IN,~, I~C. Geotechnical Engineering · Construction Materials Testing · En~ronmental Engineering · Consuffing REPORT OF FIELD ALPHA TESTtNG, tNC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 7522~ 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19199 DALLAS, TEXAS PROJECT HOLLOWS I~l NORTHLAKE WOODLAND OUR REPORT NO. 99128-7 COPPELL, TEXAS TEST DATA: TEST '~,. ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSrT'Y COMP~,CTK~N COMMENT* % PCF % PCF 35 2/19/99 SG I 26.8 92 28.9 90 98 2-A 36 2/19/99 SG I 26.8 92 27.8 91 99 2-A 37 2/19/99 SG I 26.8 92 28.3 90 98 2-A 38 2/19/99 SG I 26.8 92 26.9 92 100 2-A 39 2/19/99 SG I 26.8 92 27.0 91 99 2-A 40 2/19/99 SG I 26.8 92 29.6 89 97 2-A 41 2/19/99 SG I 26.8 92 29.2 90 98 2-A TEST LOCATION: 35 BLOCKA, PAD5 36 BLOCK A, PAD 7 37 BLOCKA, PAD9 38 BLOCK A, PAD 11 39 .BLOCK A, PAD 13 40 BLOCK A, PAD 15 41 BLOCK A, PAD 17 · ~ FILL '* A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFtCATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WTTH SPECIFICA"f~:)NS 3. LIME STABIMZED C PERCENT IN PLACE MO[SI'LIRE DOES NOT COMPLY VVITH SPECIFICATIONS 4 CEMENT'tREATED D RETEST Geotechnical Engineering · ConsfTuctian Materials Testing · Environmental Engineering · Consulting REPORT OF FIELD LPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-7A COPPELL, TEXAS TEST DATA: TEST '~,~ ELEV. BOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 42 2/19/99 SG 1 26.8 92 27.2 89 96 2-A 43 2/19/99 SG I 26.8 92 29.0 90 98 2-A 44 2/19/99 SG I 26.8 92 27.1 92 100 2-A 45 2/1 9/99 SG I 26.8 92 28.4 90 98 2-A 46 2/19/99 SG I 26.8 92 26.9 91 98 2-A 47 2/19~99 SG I 26.8 92 29.6 89 96 2-A 48 2/19/99 SG I 26.8 92 29.6 88 95 2-A TEST LOCATION: 42 BLOCK A, PAD 19 43 BLOCK A, PAD 21 44 BLOCKB, PAD 1 45 BLOCKB, PAD3 46 BLOCKB, PAD 5 47 BLOCKB, PAD7 48 BLOCKB, PAD9 ~ FILL * ^. ~. ~=~.~C~ P~C~.T UO~TU.E ^.o PE~ENT COmP^ChoN COMFY 2 NATURAL SUBGRADE B PERCENT COMPACTION OOES NOT COMPLY VVI'I'H SPECII=ICA'rlONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY W~TH SPECIFICATIONS 4 CEMENT TREATED D. RETES'r k,,. ALPI, fA...T, ESTI ,1~__.~. Geotechnicol Engineering · Constructk~ Materiols Testing · Environmental Engineering · Consutting ALPHA TESTING, INC. 2209 Wisconsin St., Suite ~00 DAILY FIELD REPORT Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: N L W DEVELOPMENT GROUP DATE: 2./19/99 DALLAS, TEXAS PROJECT: HOLLOW (~} NORTHLAKE WOODLAND OUR REPORT NO: 99128-5 COPPELL, TEXAS TECHNICIAN: J.B. WEATHER: CLEAR TEMPERATURE RANGE: 40 TO 60 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WASI~OBTAINED FROM THE FOLLOWING LOCATION: STREET CUT (NG-2') TAN CLAY A TOTAL OF 13 FIELD DENSITY TESTS WERE PERFORMED ON FILL FOR PADS. SEE ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. THE SITE REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-5A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID Om3MUM MAXIMUM LAB IN PLACE IN F~ACE PERCENT NO. DATE DEPT~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY OENSn~ COMPACnON COMMENT* 96 PCF % PCF 22 2/19/99 SG I 26.8 92 27.9 91 99 2-A 23 2/19/99 SG I 26.8 92 28.8 91 98 2-A 24 2/19/99 SG 1 26.8 92 28.6 90 98 2-A 25 2/19/99 SG 1 26.8 92 26.9 90 98 2-A 26 2/19/99 SG I 26.8 92 28.8 90 98 2-A 27 2/19/99 SG I 26.8 92 27.2 91 99 2-A 28 2/19/99 SG I 26.8 92 27.0 91 98 2-A TEST LOCATION: 22 BLOCK A, PAD 23 23 BLOCK A, PAD 25 24 'BLOCK A, PAD 27 25 BLOCK A, PAD 29 26 BLOCK A, PAD 31 27 BLOCK A, PAD 33 28 BLOCK A, PAD 35 1.FILL ~A.IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUI~GRAOE B PERCENT COMPACTION DOES NOT COMPLY WtTH SPECIFICATIONS ~#y Sub~ 3 LIME STAI~LIZED C PERCENT IN Pr. ACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D RETEST ~C. Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Car~u~ REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Daflas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 2/19/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-5B COPPELL, TEXAS TEST DATA: TEST SOIL ID Om'~UM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSFPf COMPA~ COMMENT* % PCF % PCF 29 2/19/99 SG 1 26.8 92 26.8 90 98 2-A 30 2/19/99 SG 1 26.8 92 29.1 88 96 2-A 31 2/19199 SG I 26.8 92 27.9 91 99 2-A 32 2/19199 SG I 26.8 92 28.4 91 99 2-A 33 2/19~99 SG 1 26.8 92 27.1 91 99 2-A 34 2/19~99 SG I 26.8 92 26.8 92 100 2-A TEST LOCATION: 29 BLOCK A, PAD 37 30 BLOCK A, PAD 39 31 BLOCKA, PAD 41 32 BLOCK A, PAD 43 33 BLOCK A, PAD 45 34 BLOCK A, PAD 47 FILL * A. IN Pt. ACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICA'~3NS LIME STAB~.LTED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TREATED D. RETEST ~~C. Geotechnical Engineering · CansfTuc~ Matedais Tes#ng · Envfronmental Engineering · Car~Jl#ng