Loading...
Gunner Sub-LR 980619 (2) 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 18 Job No.: 1598-0018 Project: St. Marin Apartments Location: Beltline Rd Right Hand Turn Lane ~ Main Entrance Architect/Engineer: Contractor:. Reported To: EPI - Mark Morris Date: 07/17/98 Date Cast: Specification: Quantity Represented: Sampled B~. By Order Of:. Order Number: 06/19/98 3000 psi (~ 28 days 10/10/40 cu. yds. H. Manuel (6 x 12 Inch) Nominal Cylinder Size: Area-28=27 SQ. IN. Field Number: SM061901 Maximum Load, LBS: 70900 Age When Tested, Days: 7 Cdmpressive Strength, PSI: 2510 Average Strength, PSi: Type Break: Conical (U.N.O.) Remarks: Laborato~ Numbe~ SM061902 SM061903 SM061904 76750 80270 78873 28 28 56 2710 2838 2790 2770 Compressive strength does not comply with specifications. 6743 Method of Curing: Field 3 Days, Laboratory From Temperature: Ambient 88 °F Mix 91 °F Time of Sample: 9:30 (AM)/PM Source of Concrete: Fine Aggregate: Coarse Aggregate: Water;. Cement: Fly Ash: Admixture(s): Site Concrete.__ 06/22 Transported By: Air Content 2.6 % Pick-Up Charge: Mix Code: N/A H. Manuel Slump 5.0 Yes X No Ticket No.: N/A Unit Weight PCF Yield CF/CY Inches Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Site Concrete Signed {~ P~ie Te~t Melhed~: ASTM C 31, C 3~, C 143, C 173, C 192, C 231 ami C 10~4 I of, 1