Loading...
WA9302-CS 960102 (2) uN l'gt!c ~AS'F Natgun Corporation TR~I~ISMITTAI Precast Co~t¢ ~k~ Eleven Teal Road Wakefield, MA 01880-1223 Telephone 617-246-1133 Fax 617-245-3279 TO: S & S Telemetry Company 800 Willow Street SanOer, TX 76266 A~N: James DATE: January 2, 1996 NATGUN PROJECT NO.: 95C11 RE: 6.0 MG Village Parkway Ground Storage Reservoir No. 2 City of Coppell, Texas COPIES DATE DFSCRIPTION 1 8/22/95 Executed Subcontract Agreement for Contracts of Limited Scope · A' it it it it it it it 1~ ~: 'k it it 'k it 1~ it ~ it it it it 'k it it it it it 'k it it it ~ it it it ~ it 1~ it 'k it it it it it it ~ it 'k it 'A' it ~' it it it t' it it it it it it 'k it 'k it ~¢it itit ~ it 'k it 1~ it 'k it 'k it 'k 'k 11: it "k it "k it 'kit 'kit '/: 'k 'kit it it it it it it it itit Frederick A. McDonough, Jr.~_~'/~"'~ Vice President - Construction FaM/djh Enclosures SOUTHWEST OFFICE: Suite 811, 8111 Preston Road, Dallas, TX 75225-6316, Telephone 214-368-3306 MDwesT OFFiCe: Suite 211, 2610 Sheridan Road, Zion, IL 60099-2615, Telephone 708-872-8806 Mm-ATLaNT~C OFfice: Suite 100, 3650 Winding Way, Newtown Square, PA 19073, Telephone 610-353-8315 NATGUN PROJECt--NUMBER: 95Cll --. SUBCONTRACT AGREEMENT FOR CONTRACTS O}' LIMITED SCOPE This agreement is made this 22nd day of Auqust, 1995 by and between NATGUN CORPORATION (Contractor) and S & S Telemetry Company (Subcontractor) to perform the WORK identified in Articlel.2 in accordance with the contract documents for the project. PROJECT: 6.0 MG Village Parkway Ground Storage Reservoir No. 2 OWNER: City of Coppell, Texas ENGINEER: Shimek, Jacobs, & Finklea, Dallas, Texas ARTICLE 1 Contract Payment: The Contractor agrees to pay the SubcontraCtor for satisfactory performance of the Subcontractor's work the sum of Twelve Thousand Seven , Hundred Twenty-three and N0/100 Dollars ($12,723.00). Progress payments, including payment for any authorized change orders, less retainage in accordance with the project specifications, shall be made to the Subcontractor promptly after receipt by the Contractor of payment from the Owner for the Subcontractor's work and a Waiver and Release of Lien from the Subcontractor. Final payment of the balance due shall be made to the Subcontractor no later than seven (7) days after receipt by the Contractor of final payment from the Owner for the Subcontractor's work. ARTICLE 2 Scope of Work: The Subcontractor agrees to commence Subcontractor's work herein described upon notification by the Contractor and to perform and complete such work, including any authorized change orders, in accordance with the contract documents and under the general direction of the Contractor, and in accord with the Contractor's schedule. The Subcontractor is responsible for clean-up and removal off site of debris caused by his work. The Subcontractor acknowledges that he has reviewed and understands the main contract documents regarding the WORK. WORK description is per attached Exhibit A. ARTICLE 3 Insurance: The Subcontractor shall procure and maintain in force Workmen's Compensation Insurance, Employer's Liability Insurance, Automobile, and Comprehensive General Liability Insurance, and all insurance required by the Contractor to the limits in accordance with the attached Exhibit B. ARTICLE 4 Indemnification: To the fullest extent permitted by law, the Subcontractor shall indemnify and hold harmless the Owner, the Engineer (excluding professional activities), and the Contractor from any and all claims, damages, losses, or expenses, including attorneys' fees, caused in whole or in part by any negligent acts or omissions of the Subcontractor or any of its agents, employees, or subcontractors. ARTICLE 5 Warranty: The Subcontractor warrants its work without cost to the Owner or Contractor for a period of one (1) year from the date of substantial completion of the project, or as otherwise provided by the contract documents, against all deficiencies and defects in materials and/or workmanship provided under this Subcontract Agreement. In witness thereof, the parties have executed this Agreement under seal, the day and year first written above. Title: Title: Vice President-(Yonstruction S & S Telemetry Company Natgun Corporation 800 Willow Street 11 Teal Road Sanger, TX 76266 Wakefield, MA 01880-1292 Phone: 817-458-5774 Phone: 617-246-1133 Fax: 817-458-3695 Fax: 617-245-3279 Subcontractor Contractor NATGUN CORPORATION EXHIBIT A Subcontractor WORK Telemetering 6.0 MG Water Storage Tank Location: Coppell, Texas Telemetering - LUMP SUM ITEM: $12,723.00 Work to be performed includes furnishing all labor, materials, equipment, and ihcidentals necessary for the installation of the tank's water level sensing system (high water and low water alarms), level transmitters, including concrete base, supports, boxes, junction boxes, conduit, wiring, transmitters, drilling (excluding the 3 inch core hole in the existing dome and X-ray of dome), boring, trenching, patching, testing, calibrating, permits, licenses, etc. to provide a complete, operable, tested, and accepted system. All work shall be in complete accordance with the drawings and specifications to provide a complete system. 1. Anticipated Start Date: February 1996 Completion Date: March 1996 2. OSHA regulations and Natgun Safety Standards; President's Executive Order No. 11246 regarding Equal Employment Opportunity and Affirmative Action shall be strictly adhered to. Subcontractor shall provide and use required safety equipment. 3. Subcontractor must supply and require personnel to wear hard hats and safety glasses, as well as all applicable safety equipment. 4. All overtime is considered incidental to the price. 5. Materials purchased and incorporated into the work are tax exempt.