Loading...
Gunner P2-LR000608 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND .,MATERIALS ENGINEERS DALL4S FORT WORTH HOUSTON LONGP?EW .4 USTIN l l050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 REPORT OF CONCRETE PLACEMENT CLIENT: North American Communities DISTRIBUTION: PROJECT: Karrington Apartments Archon Group - Angie Rawie TMI REPORT #: DC00-040-031 North American Communities - Kurt Heinbecker REPORT DATE: 6/8/2000 C.D. Construction - Garreth Campbell SERVICE DATE: 5/30/2000 City of Coppell - Greg Jones CONCRETE FOR: Slab CUBIC YARDS PLACED: 230 DESIGN IDENTIFICATION: 9505 READY MIX PLANT: TXI TIME OF POUR: START: 7:15 FINISH: 11:00 CONCRETE TEMPERATURE RANGE: 90 AIR TEMP. I~NGE: 85 SLUMP RANGE: 5" ENTRAINED .MR RANGE: N/A TEST CYLINDER OR BEAM ID: 1-8 TECHNICIAN: C. Newton TIME: 11:30 COMMENTS OR PROBLEMS: id This report may not be reproduced except in its emirety, without TE the ~xitten consent of TMI. Results apply only to above tests. J:.'dc forms new-fonns,'conc-insp