Loading...
Gunner P2-LR000608 (2) TERRA MAR, INC ~'~ GEOTECHNIC~s~ ENVIRONMENTAL AND MATEksALS ENGINEERS DALLAS FORT WORTH HOUSTON LONG VIEW .4 USTIN l l050,4bles Lane, Dallas, Tetras 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawie PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 6/8/2000 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-025 City. ofCoppeli - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 '9 28 d~'s Placement Date: 5..'24.-"2000 Slump (in.): 5" max Sampled By: C. Newton Air Content (%): 3 - 5 Weather: Cloudy Concrete Temp (°F): 95 Supplier/Mix: TXI; 9505 FIELD DATA: SET # 1 Ticket #: N/A Time Batched: 7:50 AM Time Sampled: 8:00 AM Slump (in.): 3.Z Air Content (%): 3.4 Unit Weight (pcf): N,'A Conc. Temp. (°F): 85 Ambient Temp. (°F): 76 Yardage (c.y.): 50..'200 Placement Location: Building ~3 Sample Location: South side building e3 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS NIOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Cylinder # Test Date Age Max Load Area Strength Notes 1 ' (Days) (lbs) (sq.in) (psi) 052401 5/31/2000 7 97250 28.27 3440 052402 6/21/2000 28 052403 6/21/2000 28 052404 Hold (1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in., b~NLESS NOTED ABOVE. (2) b~BONDED CAP SYSTEM USED. TYPE A(CONE) FRACTURE UNLESS OTHERWISE NOTED: B (CONE-SPLIT); C(CONE-SHEAR): D (SHEAR); E (COLU.~INAR) (3) FIELD TESTS ARE PER ,M~PLICABLE ASTM STANDARDS: C138. C143. C172. C231 Additional Distribution: Don Matlock - Fax: 972-906-0608 Page I of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. GEOTECHNICA_. ENVIRONMENTAL AND MATER...LS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN 11050.4bles Lane, Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawie PROJECT: Karrington Apartments North Arnerican Communities - Kurt Heinbecker REPORT DATE: 6;'8,"00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-025 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 ~ 28 da~vs Placement Date: 5/24/00 Slump (in.): 5" max Sampled By: C. Newton Air Content (%): 3 - ~q Weather: Cloudy Concrete Temp (°F): 95 Supplier..'Mix: TXI .' 9505 FIELD DATA: SET # 2 Ticket #: N:"A Time Batched: 11:40 AM Time Sampled: 1 1:55 AM Slump (in.): 8 1.'2" Air Content (%): 3..29 Unit Weight (pcf): Conc. Temp. (°F): 88 Ambient Temp. (°F): 78 Yardage (c.y.): 200."250 Placement Location: Buildirlg #3 Sample Location: West side of building. Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39. CAPPED PER ASTM Chi? Set # Cylinder # Test Date Age Max Load Area Strength Notes 2 (Days) (lbs) (sq.in) (psi) 052405 5/31/'00 7 62440 28.27 2210 052406 6/21/00 28 052407 6/'21/00 28 KAR 052408 Hold (I) NORMAL CYLINDER SIZE 6" X 12", AREA 28.2? sq. in., UNLESS NOTED ABOVE. (2) UNBONDED CAP SYSTEM USED. TYPE A~CONE) FRACTURE UNLESS OTHERWISE NOTED: B ~CONE-SPLIT'i: C~'CONE-SHEAR); D (SHEAR): E ~COLUMNAR) (3) FIELD TESTS ARE PER APPLICABLE AST.\I STANDARDS: C~35. C143, CI72. C231 additional distribution: Don Matlock - Fax: 972-906-0608 id Gary ~D. Dry -~',/ Page 2 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. ,--' TERRA-MAR, INC. ~ GEOTECHNICA. · ENVIRONMENTAL AND MATERi~-tLS ENGINEERS D/ILL4S FORT WORTH HOUSTON LONGVIEW AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawie PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 6/8/2000 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-025 City. ofCoppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 5/24/2000 Slump (in.): 5" max Sampled By: C. Newton Air Content (%): 3 - 5 Weather: Cloudy Concrete Temp (°F): 95 Supplier:'Mix: TXI .." 9505 FIELD DATA: SET # 3 Ticket ~: N."A Time Batched: 12:00 PM Time Sampled: 12:!5 PM Slump (in.): 5" Air Content (%): 3.5 Unit Weight (pcO: N/A Conc. letup. (°F): 89 Ambient Temp. (°F): 79 Yardage (c.y.): 220/250 Placement Location: Building *3 Sample Location: North side of building .~3. Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM C617 Set # Age Max Load Area Strength 3 Cylinder # Test Date (Days) (lbs) (sq.in) (psi) Notes 052409 5/31/2000 7 74930 28.27 2650 052410 6/21/2000 28 052411 6/21/2000 28 052412 Hold (1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in., L~LESS NOTED ABOVE. (2) L~BONDED CAP SYSTEM USED. TYPE A(CONE) FRACTURE L',~LESS OTHERWISE NOTED: B (CONE-SPLIT); C(CONE-SHEAR): D (SHEAR); E (COLU~INAR) (3) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. CI43. CI72. C231 additional distribution: Don Matlock - Fax: 972-906-0608 Page 3 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.