Loading...
Gunner P2-LR000601 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW .4 USTIN l l050.4bles Lane, Dallas, Texas 75229 Phone:9?2-488-8800 REPORT OF CONCRETE PLACEMENT CLIENT: North American Communities DISTRIBUTION: PROJECT: Karrington Apartments Archon Group - Angie Rawie TMI REPORT #: DC00-040-028 North American Communities - Kun Heinbeckcr REPORT DATE: 6/1/2000 C.D. Construction - Garreth Campbell SERVICE DATE: 5/23/2000 Ci~' of Coppell - Greg Jones CONCRETE FOR: In lets CUBIC YARDS PLACED: 7 DESIGN IDENTIFICATION: READY ~ PLANT: Lafimore TItlE OF POUR: START: 2:00 FINISH: 4:00 CONCRETE TEMPERATURE RANGE: 89 .AIR TEMP. RANGE: 94 SLUMP RANGE: 1 1/2" ENTRAINED AIR RANGE: N/A TEST CYLINDER OR BEAM ID: 01 - 04 TECHNICIAN: M. Ardito TIME: COMMENTS OR PROBLEMS: id 22~is report may not be reproduced except in its entirety, without TE Inc. the ~witten consent of TMI. Results apply only to above tests. J:.'dc. tbrms, new,'forms:conc-insp