Loading...
Gunner P2-LR000601 (2) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALL4S FORT WORTH HOUSTON LONGVIEW AUSTIN ll050.4bles Lane, Dallas, Texas 75229 Phone:972-488-8800 REPORT OF CONCRETE PLACEMENT CLIENT: North American Communities DISTRIBUTION: PROJECT: Karrington Apartments Archon Group - Angie Rawie TMI REPORT #: DC00-040-029 North _a~ncrican Communities - Kurt Heinbecker REPORT DATE: 6/1/2000 C.D. Construction - Garreth Campbell SERVICE DATE: 5/25/2000 City of Coppell - Greg Jones CONCRETE FOR: Utlilit..' area CUBIC YARDS PLACED: 6 DESIGN IDENTIFICATION: READY MIX PLANT: Latimorc / 44 TIME OF POUR: START: 2:00 FINISH: 4:00 CONCRETE TEMPERATURE RANGE: 75 - 95 AIR TEMP. RANGE: 90 SLUMP RANGE: 3-5 ENTRAINED AIR RANGE: N/A TEST CYLINDER OR BEAM ID: 5-25-01 / 5-25-04 TECHNICIAN: M. Yahyazdeh TIME: 2.0 hours COMMENTS OR PROBLEMS: id This report ma)' not be reproduced except in its entirety, without TE In__' the x~Titten consent of TMI. Results apply only to above tests. J::dc;forms.'new.'forms;conc-insp