Gunner P2-LR000526 TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW ,4USTIN
11050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-8800
SOIL MOISTURE -DENSITY TEST REPORT
IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D-2922)
CLIENT: North American Communities DISTRIBUTION:
PROJECT: Karrington Apartments Archon Group - Angie Rawie
TMI REPORT #: DC00-040-024 N. American Communities - Kurt Heinbecker
REPORT DATE: 5/26/00 C.D. Construction - Doyle Dameron
PAGE 1 OF 2 City of Coppell - Garreth Campbell
Ci~' of Coppell - Greg Jones
Don Matiock - Fax: 972-906-0608
SPECIFICATIONS TEST DATA
Percent Compaction: 95 Date Tested: 5-"22..'00
Moisture Content ("/,,): Opt. or above Technician: S. Adli
MATERIAL REFERENCE CURVE DATA
CURVE TEST O.M.C. M.D.D.
NO. METHOD MATERIAL DESCRIPTION ("A,) (PCF)
6782 ASTM-D698 Dark Brown & Olive Brown Clay w/Limestone Fragments 27.1 91.1
6689 ASTM-D698 Dark Brown & Tan Clay w: Limestone Fragments 21,7 98.4
6653 ASTM-Db98 Olive Clay 19,9 101.1
IN-PLACE TEST RESULTS
DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017. RESPECTIVELY
TEST ELEVATION REF. 'Y,, WET DRY %
NO. OR LIFT LOCATION CI. RVE MOIST. DENSITY DENSITY DENSITY
8" Water Line
1 -2 50' N. & 30' W. of NW comer bldg pad 1 6782 29.4 115.8 89.5 98
2 Top 50' N. & 30' W. of NW comer bldg pad 1 6782 28.6 116.8 90.8 100
3 -2 50' N. & 30' W. of SW comer bldg pad 9 6782 30.3 115.2 88.4 97
4 Top 50' N. & 30' W. of SW comer bldg pad 9 6782 29.3 116.6 90.2 99
5 -2 60' W. & 20' S. of SE comer bldg pad I0 6782 28.6 l 11.9 87.0 95
6 Top 60' W. & 20' S. of SE comer bldg pad 10 6782 28.9 114.1 88.5 97
7 -2 70' W. & 20' S. of SE comer bldg pad 13 6689 24.1 120.7 97.3 99
8 Top 70' W. & 20' S. of SE comer bldg pad 13 6689 23.2 119.5 97.0 99
9 -2 50' N. & 50' E. of NE comer ofbldg pad 11 6782 30.7 114.9 87.9 96
10 Top 50' N. & 50' E. of NE comer ofbldg pad 11 6782 30.8 113.5 86.8 95
GAUGE SN: 3140 DENSITY STD. COUNT: 3859 .MOISTURE STD. ('O[.'NT: 425
"R" AFTER TEST NUMBER INDICATES RETEST. GAUGE MAN[.'FA(.'TLRER: Humb
* INDICATES FAILURE TO ('OMPLY WITH PROJECT SPECIFICATIONS G.-\L'GI-~ MODE[_ NO.:
REMARKS:
~d
%%
Project Manager
Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.