Loading...
Gunner P2-LR000526 (3) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL .aND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW .4USTIN 11050 Ables Lane. Dallas. Texas 75229 Phone:972-488-8800 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D-2922) CLIENT: North American Communities DISTRIBUTION: PROJECT: Karrington Apartments Archon Group - Angle Rawie TMI REPORT #: DC00-040-023 N. American Communities - Kurt Heinbecker REPORT DATE: 5~26~00 C.D. Construction - Doyle Dameron PAGE I OF 2 City o£Coppell - Garreth Campbell Cib' of Coppell - Greg Jones Don Matlock - Fax: 972-906-0608 SPECIFICATIONS TEST DATA Percent Compaction: 95 Date Tested: 5." 15/00 ,Moisture Content {%): Opt. -2 to '4 Technician: J. Moreland MATERIAL REFERENCE CURVE DATA CURVE TEST O.M.C. M.D.D. NO. METHOD MATERIAL DESCRIPTION (%) (PCF) 6782 ASTM-D6L)8 Dark Brown & Olive Brown Clay w: Limestone Fragments 27.1 91.1 6689 ASTM-D698 Dark Brown & Tan Clay w/Limestone Fragments 21.7 98.4 6653 ASTM-DagS Olive Clay 19.9 101.1 3 .~S'rM-D60S Olive & Broxvn Sandy Clay 17.3 107.6 IN-PLACE TEST RESULTS DENSITY ,,*,ND MOISTURE TESTS ARE PER ASTM D2922. D3017. RESPECTIVELY TEST ELEVATION REF. % WET DRY % NO. OR LIFT LOCATION CURVE MOIST. DENSITY DENSITY DENSITY 1R F6-3 Re-test #17 on 5-9-00 6782 29.1 118.5 91.8 101 2R F6-2 Re-test #18 on 5-9-00 6689 25.4 123.8 98.7 100 3 F6 8" sewer ~ station 11+47 center line 6782 29.2 117.7 91.1 100 4 F6-1 8" water line ~ station 3+50 center line 6782 28.5 116.5 90.7 100 5 F6 8" water line @ station 3+49 center line 3 20.9 124.0 102.6 95 6 F6-1 8" water line ~ station 7+00 center line 3 20.8 128.7 106.5 99 7 F6 8" water line ~ station 6+99 center line 6782 28.8 117.2 91.0 100 8 F6-1 8" water line ~ station 9+25 center line 6689 22.9 115.6 94.1 96 9 F6 Apt. bldg # 18 of SW comer 10' N. & 20' W. 6689 20.8 118.4 98.0 100 10 F6 Apt. bldg #18 of SW comer 10' N. & 45' W. 6689 24.5 118.4 95.1 97 GAUGE SN. 3141 DENSITY STD. COUNT: 3829 MOIS/L'RE STD. C(_)tJN'F: 434 "R" AFTER TEST NUMBER INDICATES RETEST. GAUGE MANUF:\CTI:'RI_:R: * INDICATES FAILURE TO COMPLY WITH PROJECT SPE('IFICATIONS GAUGE MODEL NO.: REMARKS: Project .Manager/i 7~ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.