Loading...
Gunner P2-LR001002 (4) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LO:VGVIEW .4USTIN 11050.4bles Lane. Dallas, Texas 75229 Phone:972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 10.'2..'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-095 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): ~000 Placement Date: 9.-'1 ."00 Slump (in.): 1 - ~ Sampled Bx.': C. Kalu Air Content (%}: ~, - 6 Weather: Clear Concrete Temp ~°F): 9..~ Supplier.-Mix: TX][ FIELD DATA: SET #1 Ticket #: 2725473 Time Batched: 6:43 AM Time Sampled: 7:45 AM Slump (in.}: N A Air Content (%): 4.5 Unit Weight tpct3: N."A Conc. Temp. ~:F): 9_2 Ambient Temp. (°F): 98 Yardage ~c.y.): ~ Placement Location: Paving Sample Location: Approximately 20' N & 35' W of SW comer of Building ~13 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C'31. TESTED PER ASTM C39. (':\PPI.=_D PER ..\S'FM Set # Age Max Load Strength Notes 2 Cylinder # Test Date (Days) (lbs) Area (sq.in) (psi) 090105 9/8."00 7 68150 28.27 2410 090106 9/29/00 28 89540 28.27 3170 090107 9/29/00 28 87450 28.27 3090 090108 Discard (I) NORMAL CYLINDER SIZE o" X !2"..&REA 28.27 sq. ll'l.. UNLESS NOTED ABOVE. (2) UNBONDED ('AP SYSTEM USED UNLESS O'YHERWISE NO'/ED ABOVE. (3'~ FIELD TESTS ARI-: PER APPI..I('ABLE ASTM STANDARDS. (' 138. (.'143. C172. ('231 Page 1 of 3 CME Manager - Dallas Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.