Loading...
PA0101-LR010726REPORT OF REINFORCING STEEL OBSERVATION 8901 Cm'penter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/26/01 Report No.: 94011093.0027 Client No.: COPPEL Project No Client: Cit, - Parks &Recr ation :w Browt irkEast Moore Road oppell, TX 75019 Coppell, Services: [ g for compliance with PROJECT DATA Drawings Utilized: /i~ Locations/Items Observed: Sidewalks, see attached sketch ~~ ~00j Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ~lacing Drawings Approved X Bar Length and Shape X Column Tied Properly Bar Size X ~roper Bar Placement X Ties and Spaces Bar Grade X Propedy Tied X ~tirrup Spacing/Type Rebar Clean X Dowel Bars in Place X Nelded Splices Form Clean X Proper Bar Supports X Vlechanical Splices Number of Bars X Lopped Splices X Proper Cover Discrepancies/Comments: No discrepancies noted at the time of observation. Technician: A. Garcia Reoort Distribution: (1) City of Coppell - Parks & Recreation (1) TLB Construction (l) City of Coppell - Constr. Insp. Eric J. Cleveland, P. E. Senior Project Engineer 309sks This repor~ is exclusively 1or the use of the client indicated above and shall not be reproduced without written approval of HBC Engineering, Inc.