1. Amend proposed subdivision name from "International Shoot-Out" to "Hooptown" to
remain consistent. Ensure name is changed where referenced throughout the plat.
Complete on drawing.
2. Show proposed 24' wide fire lane easements.
Complete on drawing.
3. Show topography with contour intervals of 5' or less.
Complete on drawing.
4. Show proposed building setback lines in accordance with the LI "Light Industrial"
zone regulations. (See #23 below regarding required setbacks)
Complete on drawing.
5. Eliminate the following signature lines from the preliminary plat:
· City Secretary--Still on drawing (can be removed)
· TXU Electric and Gas--Removed
· General Telephone--Removed
· Name and Title --Remved
6. Show anticipated water demand and sanitary sewer flows.
Not on current drawing. (Why on Plat?) Can have on Sept. 12. Clarify what
format.
7. Eliminate notation of the 15' landscape setback; this is not represented on the plat.
Complete, removed from drawing.
8. A transformer is proposed to be located toward the rear of the property; show TXU
easements.
Utility easement shown from Belt Line to building.
*Please note that the current lot under review for site plan approval is only Lot 1 and ali
requirements, such as landscaping, tree preservation and mitigation must occur on this lot;
trees, lot area, etc. provided on Lot 2 can not apply toward the requirements for Lot 1.
Elevations
9. Review proposed building elevations and make efforts to scale down the building and
reduce massing, using appropriate architectural variation and features and/or
additional landscaping surrounding the building.
Need to discuss city's idea.
10. Staff would encourage the applicant to provide additional brick facing Belt Line Road,
in keeping with the style of existing Coppell buildings.
Need to discuss intent, current elevation complies with city requirements.
11. Staff would also encourage the elimination of composite aluminum panel cladding.
While a variation of materials is encouraged, this is not a recommended material.
Amount reduced on elevation.
12. Revise elevations to show proposed landscape trees at a more appropriate height, not
a full mature height.
Complete.
Site Plan
13. Clearly show proposed location of monument sign on both the site and landscape plans.
Per Section 29-4.2 (Bi) of the sign ordinance, the monument sign must be set back a
minimum of 15 feet from the property line.
Complete.
14. Clearly show proposed 24' wide fire lane and label as such. As currently shown, it is
difficult to interpret.
Complete.
15. Revise Label for adjacent residential subdivision to read "SF9-PD 104."
Complete.
16. Show breakdown of parking calculations. Indicate why the need for the specific amount
of parking provided. If available, provide examples of other similar uses. Staff is
concerned that parking may not be adequate.
Complete. Chart on drawing.
17. Provide completed tree survey.
Complete.
18. Provide Tree Mitigation Plan and indicate how existing trees at the rear of the site
will be preserved or their loss mitigated due to the detention pond. Note that staff
will require substantial vegetation and/or a solid screen wall to screen from adjacent
residences.
Complete.
19. Provide additional information (type of fixture, lumens, manufacturer's specifications)
on proposed building wall lights and indicate precautions taken to prevent excessive
spillover lighting for both the parking lot and building wall lights to adjacent properties.
Complete.
20. Indicate whether a snack/juice bar is proposed; any food preparation will require a
special use permit.
Our understanding of our submitted PD does not require a sup for this use.
21. Provide a floor plan. Indicate if bleachers are provided throughout.
No bleachers, see floor plan.
22. Indicate proposed materials for dumpster screen wall.
Complete, on plan.
23. Provide note on the site plan that all mechanical equipment shall be screened from
view.
Note 25 a site plan included.
24. Revise site plan to show the appropriate setbacks:
Complete per city comments.
Front Yard-60'
Side Yard-10'
Rear Yard-50' (adjacent to property in a residential district)
25. Please note that a color board must be provided at the September 7, 2000 Development
Review Committee Meeting.
Complete.
Landscape Plan
26. Revise sheets LI, L2, &L3, to reflect the correct acreage for the subject site.
Complete.
27. Sheet L2 shows a "Temporary Lot Line" between lots 1 & 2. Remove this note from the
plan; the site plan and preliminary plat must coincide and this is currently proposed as a
separate lot. Also indicate to staff the intentions for development of Lot 2.
Complete.
28. Revise landscaping calculations to accurately reflect requirements set forth in the
Landscape Ordinance. For example, staff calculates 3858 Lineal feet, requiring 78 trees
and the plan indicates that only 32 trees are required. Provide landscape calculations per
Section 34 of the zoning Ordinance.
Complete.
Additionally, revise landscape plan to provide the required landscape screen or barrier in the
perimeter landscape area. Per Section 34-1-8 (C) 1-2, A landscape screen or barrier shall be
installed in the perimeter landscape area and plants used in living barriers shall be at least 30
inches in height, such as Dwarf Burford Holly, Dwarf Needlepoint Holly, or Nellie R. Stevens
Holly. Please contact staff if additional interpretations are needed.
A. Please revise plats, site plans, landscape plans, and building elevations based on staff
recommendations. Should applicant disagree with staff comments please provide reasons
why staff recommendations should not be followed when you attend the September 7th
Development Review Committee (DRC) meeting.
B. Each applicant will bring two new sets of revised plats and plans to the September 7th
DRC meeting. Applicants will be asked to show, explain and defend any revision. A
representative for this project is required to attend the meeting.
C. Applicant will have until noon Tuesday, September 12th to resubmit eighteen (18) folded
copies of revised plans and three (3) reduced paper copies (8 1/2 x 11) of each exhibit to
the Planning Department.
Staff Comments
Contact: Mike Martin, P.E., Assistant City Engineer (972-304-3679) on Items PD-189
zoning change request to LI
1. No trees should be planted on top of the proposed waterlines around the property.
Will comply.
Contact: Travis Crump, Fire Marshal (972-304-3503) on Items PD-189, Hooptown AND
Hooptown, Lots 1 & 2 BLK A
1. Show all fire lanes. All portions of the building to be within 150 feet of a fire lane. Plat
fire lanes as easements.
Complete.
2. On site fire hydrants required. Shown on site plan.
3. Additional Fire Department requirements will be addressed during plan review process.
Contact: Greg Jones, Chief Building Official (972-304-3500) on Hooptown
No comments.
Contact: Brad Reid, Park Planning and Landscape Manager on Zoning Change
1. Need a complete Tree Survey.
Complete.
2. A Tree Removal Permit is required to be executed prior to removal of any trees.
Will comply.
3. The existing trees to remain on Lot 2 will not be considered for tree preservation credits
as this property is labeled for future developments.
Comments for the City of Coppell Development Review Committee
Jeff Curry on PD-189, Hooptown
1. Zoning Change Acceptable
Jeff Curry on Lots 1 & 2, Block A, Preliminary Plat
1. Plat Unacceptable
2. Easements for TXU Electric and Gas facilities will be required on plat. Please contact
Jeff Curry at 972-570-4126 to discuss easement requirements.
Complete, shown on drawing.