Loading...
Hollows-CS 990323 MEMORANDUM SUBJECT: Storm Drainage System The purpose of this memo is to provide the drainage information per your requested, based on our conversation on March 18, 1999. Our calculation for the existing (2)-36" RCP pipes show that those pipes are under sized and does not have the capacity to handle the amount of -~ discharge from the Hollows (~ Northlake Woodlands development. The calculations indicate 'i.-~::. that we would have a surcharge above the top of our inlets. Our plans reflect part of the · .'~. surcharge applied to the existing storm drain system. , ~,~,iI -. - As we have discussed before, the detention area in the Dallas, Light and Power Easement would provide relief of the discharge into the (2)-36" RCP pipes and it is our understanding that Tipton Engineering Inc. will calculate the detention system. If you have any questions or comments regarding the above memo, please contact our office at (214) 654-0123. Thanks Chris Lam CC: File Page 1 2351 Vt~ Northwest Hwy., Suite 3280 ~ Deila~. Texas 75220 ~ (214)-654-0123 ~ FAX (214)-654-0122 f501 Merr~m~, Suite 100 ~ Fo~t Worth, Texes 76107 ~ (817).335.1121 ~ FAX(817)-33&7437 215 N Oak Street, Suite B ~ Roenoke, Texas 76262 ~ (817)-491.0929 ~ FAX (817)-491-0640 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO VER SHEET To: ~4 Fax: ? ? / - - /9 Date: Phone: Pages: Re: CC: [] Urgent [] For Review []Please Comment [] Please Reply [] As Requested IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679 Engineering- Excellence By Design