Loading...
Huntington-CS 940609The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 9, 1994 Mr. Bill Anderson Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 RE: Huntington Ridge Replat Lot 32, Block A Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Huntington Ridge Replat Lot 32, Block A. Please provide a check made payable to the City of Coppell in the amount of $2,385.00 and forward it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. If you have any questions, please do not D~r~ We look forward to working with you on this project. hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CC: Date: Project: CITY OF COPPELL DEVELOPMENT FEES June 9, 1994 Huntington Ridge Replat Lot 32, Block A Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Building Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) (100% due at Issuance of Building Permit) Water Meter Deposit (Residential) (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) (100% due at Issuance of Water Meters) Irrigation Meter Deposit (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * (100% due prior to Acceptance of Project) Park Fee (100% due prior to Council Approval) Construction Inspection Fee (2% of Project Cost due prior to Preconstr. Mtg.) TOTAL TOTAL FEES DUE $ 650.00 $100.00 $ 450.00 $100.00 $ 50.00 $ 22.25 $ 30.00 -0- -0- -O- information not available $1,285.00 need submittal of contracts $ 2,687.25 $ 650.00 -0- $ 450.00 -0- -0- -0- $1,285.00 -0- TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 2,385.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: June 3, 1994 Engineering Department~ ~ PublicWorksStaff ~J"~'~ Development Fees for Huntington Ridge Replat Lot 32 Block A The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's @ $650.00 ea = $ 650.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 1 - 5/8" x 3/4" Domestic Meter/s = Total 1 ESU's @ $450.00 ea = 1 ESU ' s 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 1 Connections @ $100.00 each = $ 100.00 lOO% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections @ $100.00 each = $ 100.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Deposit (Residential) 1 Meters @ $30.00 ea = $ 30.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-F~mily or Non-Residential) Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. 15:51 002 . For thOse d~velop~ents having preliminary plat approval prior to June 23, 1~92 the following assessment is determined: Residential Lots at $150.00 each - $ Units (Multi family) at $?5.00 each --~ 50% of. the ,mount specified above shall be paid by the Developer! prior to Council approval of final plat. 50% re~lnin~ shall be paid by the BUilder at such time as a building permit is issued. For tho~e developments having preliminary, plat approval after June 23, 19~2 ~e follow~n~ a~sessment is determined; . Residential Lots at $350.00 each - .$ Units (MulCt-Family) aC $350.00 each - $ $0% of the ~u~ount ~pecified above shall be paid by the Developer prior to Council approval of final plat. ~0% remaining shall ~e paid by the Builder at such time as a building per, it is issued. For those developments having preliminary p/at approval after October 26, 1~93 the following assessment is determined: 1 ~ Residential Lots at $1,265.00 each - $ 1.285.00 Unt~s (Multi-Family) aC $i,2e5.00 each -- ~._ 100% of the amount s~cified above shall be paid ~y the Developer prior ~o Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Shall ~ e~se~sed and paid prior to final acceptance of pro~ect. No~e~ Thi~ fee o.nnot be assessed until after TU Electric submits the lighting plan for the' proposed project. Once plan is submitted $292.60 per light will be assessed.