Huntington-CS 940609The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
June 9, 1994
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, TX 75248
RE: Huntington Ridge Replat Lot 32, Block A
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Huntington Ridge Replat Lot 32, Block A.
Please provide a check made payable to the City of Coppell in the amount of $2,385.00 and forward
it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. Please
provide our office a copy of the Engineer's Estimate or contract for this project so the construction
inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
If you have any questions, please do not D~r~
We look forward to working with you on this project.
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CC:
Date:
Project:
CITY OF COPPELL
DEVELOPMENT FEES
June 9, 1994
Huntington Ridge Replat Lot 32, Block A
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100% due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic)
(100% due at Issuance of Building Permit)
Water Meter Deposit (Residential)
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire)
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee *
(100% due prior to Acceptance of Project)
Park Fee
(100% due prior to Council Approval)
Construction Inspection Fee
(2% of Project Cost due prior to Preconstr. Mtg.)
TOTAL
TOTAL
FEES DUE
$ 650.00
$100.00
$ 450.00
$100.00
$ 50.00
$ 22.25
$ 30.00
-0-
-0-
-O-
information not
available
$1,285.00
need submittal of
contracts
$ 2,687.25
$ 650.00
-0-
$ 450.00
-0-
-0-
-0-
$1,285.00
-0-
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
$ 2,385.00
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
June 3, 1994
Engineering Department~ ~
PublicWorksStaff ~J"~'~
Development Fees for Huntington Ridge Replat Lot 32 Block A
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 5/8" x 3/4"
Domestic Meter/s = 1 ESU's
Total 1 ESU's @ $650.00 ea = $ 650.00
100% due prior to Council approval of the final plat.
Wastewater Impact (City)
1 - 5/8" x 3/4" Domestic Meter/s =
Total 1 ESU's @ $450.00 ea =
1 ESU ' s
450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
1 Connections @ $100.00 each = $ 100.00
lOO% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1 Connections @ $100.00 each = $ 100.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 22.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Deposit (Residential)
1 Meters @ $30.00 ea = $ 30.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-F~mily or Non-Residential)
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
15:51 002 .
For thOse d~velop~ents having preliminary plat approval prior to June
23, 1~92 the following assessment is determined:
Residential Lots at $150.00 each - $
Units (Multi family) at $?5.00 each --~
50% of. the ,mount specified above shall be paid by the Developer!
prior to Council approval of final plat.
50% re~lnin~ shall be paid by the BUilder at such time as a building
permit is issued.
For tho~e developments having preliminary, plat approval after June 23,
19~2 ~e follow~n~ a~sessment is determined;
. Residential Lots at $350.00 each - .$
Units (MulCt-Family) aC $350.00 each - $
$0% of the ~u~ount ~pecified above shall be paid by the Developer prior
to Council approval of final plat.
~0% remaining shall ~e paid by the Builder at such time as a building
per, it is issued.
For those developments having preliminary p/at approval after October
26, 1~93 the following assessment is determined:
1 ~ Residential Lots at $1,265.00 each - $ 1.285.00
Unt~s (Multi-Family) aC $i,2e5.00 each -- ~._
100% of the amount s~cified above shall be paid ~y the Developer
prior ~o Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Shall ~ e~se~sed and paid prior to final acceptance of pro~ect.
No~e~ Thi~ fee o.nnot be assessed until after TU Electric submits
the lighting plan for the' proposed project. Once plan is
submitted $292.60 per light will be assessed.