Loading...
Hollows-CS 990215 FILE · Coppell. Texas 75019 __The City With A Beautiful Future 972-462-0022 February ~.5, ~.999 Richard Hovas, P.E. Tipton Engineering, Inc. 6330 Broadway Blvd., Suite C Garland, TX 75043 RE: The Hollows at Northlake Woodlands Development Fee Assessment Dear Mr. Hovas: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $324,860.00 and forward to Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. S~c?rely~ · Michael A. Martin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: The Hollows at Northlake Woodlands Date: 2/15/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $83,250.00 $83,250.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $3,700.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $4,273.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $2,590.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $83,250.00 $83,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $3,700.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $3,700.00 (100% due at Issuance of Building Permit) Park Fee $95,090.00 $95,090.00 (100% due prior to Council Approval) Roadway Impact Fee $63,270.00 $63,270.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $342,823.50 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $324,860.00 DEVELOPMENT FEE WORKSHEET PROJECT: The Hollows at Northlake Woodlands DATE: 2/15/99 Water Impact Fee: Domestic Meter(s): 74 - 1 inch = 185 ESU's Irrigation Meter(s): = ESU's = ESU's Fireline Meter(s): = ESU's Total #: 185 ESU's @ $450.00 ea. $83,250.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 74 Connections @ $50.00 ea. $3,700.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 74 Domestic Meter(s) @ $57.75 $4,273.50 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 74 Meter(s) @ $35.00 ea. $2,590.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 185 @ $450.00 ea. $83,250.00 Wastewater Tap Inspection Fee: Total #: 74 Connections @ $50.00 ea. $3,700.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total 0: 74 Lots @ $50.00 ea. $3,700.00 (100% due prior to issuance of building permit) Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 74 Single-family @ $1285.00 / Lot $95,090.00 N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $63,270.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: The Hollows at Northlake Woodlands DATE: 2/15/99 ROADWAY IMPACT Fl~F~: Service Area * 7 Category ** Residential Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** 74 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $63,270.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)