Hollows-CS 981015 CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: THE HOLI,OWS AT NORTHIJAKE
WOODI,ANDS, FINAl, PIJAT
P & Z HEARING DATE: October 15, 1998
C.C. HEARING DATE: November 10, 1998
LOCATION: Along the north side of the DART Right-of-Way; between
Mockingbird Lane and S. MacArthur Boulevard.
SIZE OF AREA: Approximately 32 acres (71 residential lots).
CURRENT ZONING: SF-9 (Single Family-9).
REQUEST: Final Plat approval.
APPLICANT: Developer: Engineer:
N.L.W. Development Group Tipton Engineering, Lac.
5309 Clear Ridge 6300 Broadway, Suite C
Dallas TX 75248 Garland TX 75043
972-250-2325 972-226-2967
Fax 972-226-1946
HISTORY: City Council established SF-9 zoning in May, 1998. The Planning
and Zoning Commission recommended approval of the Preliminary
Plat in June, 1998, and Council approved the Preliminary Plat in
August, 1998.
TRANSPORTATION: Mockingbird Lane is a C2U two-lane undivided collector built to
standard within a 60'-wide Right-of-Way. East Belt Line Road is
a P6D six-lane divided primary arterial to be funded and scheduled
for County construction within an existing 120'-wide Right-of-
Way.
SURROUNDING LAND USE & ZONING:
North- Northlake Woodlands East Phase 10; SF-9
South - Railroad, undeveloped; C
East - TU Electric R.O.W. & MacArthur Plaza; A & C
West - Northlake Woodlands East Phase 8; SF-12
Item # 11
COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for
medium density residential uses.
DISCUSSION: The Final Plat complies with the approved Preliminary Plat.
Council will be the Final Plat approval authority. However, prior
to recording the plat the applicant will need to furnish verification
that TU Electric consents to all pavement proposed within
transmission line easements.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
The planning staff recommends approval subject to the applicant
providing verification prior to recording the plat that TU Electric,
consents to all pavement proposed within transmission line
ALTERNATIVES: 1) Recommend approval of the request
2) Recommend disapproval of the request
ATTACHMENTS: 1) Final Plat
Item # 11