Huntington-CS 930806COPPELL PUBLIC WORKS MEMORANDUM DATE: August 6, 1993 TO: FROM: RE: Larry Davis, Construction Inspector Rey Gonzales, Streets Superintendent' Follow up Walk Through - Huntington Ridge August 6, 1993 The following is a list of discrepancies found at the above referenced subdivision during the follow up walk through this morning. 1. Excessive dirt on all roads and alleys throughout the project, especially at the Kingridge approach. 2. Alley - Corner of panel broken @ construction joints @ Diamond Ridge. 3. No inlet lid on alley north Black Oak. 4. Concrete chips in curb - Clover Meadow, north side near Diamond 5. Surface north end of Black Oak is flaking - Unacceptable 6. Mud ball holes on north end of Black Oak 7. Random crack south side of Ridgewood approach to Denton Tap. 8. Reseal gutter joint 6 panels west of inlet north end of Black Oak. 9. Concrete chip in curb joint just west of inlet north end of Black Oak. Please make sure the contractor receives a copy of this list in order to ensure that these issues are addressed. Thank you! RG/rg cc: Central File FWTHUNTR.RG