WA9302-CS 960213SHIMEK, JACObS & FINKLEA CONSTRUCTION REPORT 'roje. No. 94155 Date: 2/13/96 Prepared Is This A By: Matt Hiekey ~ Working Day? [] Yes [] No Owner: City of Coppell Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Contractor: NATGUN Time Allotted: 300 Used: 206 Number Superintendent: Jim Fisher Men Working: 20 Hours: 9:10 AM to 10:00 AM Weather Conditions: Clear and Cool Site Conditions: The site ~vas dry and well maintained. WORK DESCRIPTION 1. All wall panels are erected and in place. The steel plates between the wall panels were being installed. 2. One Hundred Sixty of One Hundred Sixty Eight dome panels have been placed on the shoring system. 3. The dome panel above the precast wall panel that will contain the inflow pipe will be placed on the shoring system once the inflow pipe is put into the tank. The inflow pipe was being bolted together. The bolts at the flanges of the inflow pipe will be painted to prevent corrosion. 4. The driveway at the pump station is being removed and electrical conduits are being located by the contractor for the Village Parkway Pump Station Addition Project. Mr. Larry Davis showed concerns that heavy spring rains may cause drainage problems that will allow water to get under the foundation of the pump station. Jim Fisher indicated that debris along the natural drainage path to the concrete channel south of the tank site will be removed and on site drainage along the tank will be provided and maintained at all times. cc: Mr. Bob Barbarisi, Jr.