Huntington-CS 930125The City With A Beautiful Future
January 25, 1993
P,O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas Parkway, Suite 100
Dallas, TX 75248-2684
RE: Huntington Ridge
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy
of the development fee calculations for Huntington Ridge.
Please provide a check made payable to the City of Coppell in the amount of $87,395.35 plus
2% of the construction cost and forward it to Mr. Alan Johnson, Assistant Finance Director,
Finance Department, along with a copy of the fee assessment list. This should be provided prior
to City Council approval of the final plat. Also, please provide our office a copy of the
Engineer's Estimate or contract for this project so the construction inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Assistant Finance Director
Greg Jones, Acting Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
January 25, 1993
Huntington Ridge
Park Fee
(50% due prior to Council Approval)
(50% due at Issurance of Building Permit)
Water Impact Fee*
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100% due at Issuance of Building Permi0
Wastewater Impact Fee
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee
(100% due at Issuance of Building Permit)
Water Meter Fee (Lots)
(100% due at Issuance of Building Permi0
Water Meter Fee (Irrigation)
(100% due at Issuance of Water Meters)
Water Meter Deposit
(100% due at Issuance of Building Permit)
Irrigation Meter Deposit
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Council Approval)
Street Light Fee
(100 % due prior to Council Approval)
Construction Inspection Fee
(2 % of Project Cost due prior to
Preconstruction Meeting)
Total
TOTAL
ASSESSMENT
$ 12,000.00
$ 58,500.00
$ 8,200.00
$ 18,000.00
$ 8,000.00
$ 4,000.00
$ 1,780.00
$ 314.00
$ 2,400.00
$ 70.00
$ 1,091.55
$ 3,803.80
$118,159.35
AMOUNT DUE
PRIOR TO COUNCIL
APPROVAL
$ 6,000.00
$ 58,500.00
$ -0-
$ 18,000.00
$ -0-
$ -0-
$ -0-
$ -0-
$ -0-
$ -0-
$ 1,091.55
$ 3,803.80
$ 87,395.35
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
*This amount includes 2 - 1 1/2" irrigation meters.
87,395.35
+2% inspectim fee
DATE =
TO:
RE:
COPPELL PUBLIC WORKS
~MORANDUM
January 22, 1993
Ken Griffin, City En~i_~er
.or s
Development Fees for Huntington Ridge
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
80 - 5/8" x 3/4" Domestic Meter/s = 80
2 - 1 1/2" Irrigation Meter/s = 10
ESU'S
ESU'S
Total 90 ESU's @ $650.00 ea = $ 58,500.00
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
80 - 5/8" x 3/4" Residential Meters = 80 ESU's
Total 80 ESU's ~ $225.00 ea = $ 18,000.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
82 Connections ~ $100.00 each = $ 8,200.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
80 Connections ~ $100.00 each = $ 8,000.00
100% due prior to issuance of building permit.
Utility Final Inspection Fee
80 lots @ $50.00/lot = $ 4,000.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
80 - 5/8" x 3/4" Residential Meters ~ $22.25 ea
100% due prior to issuance of building permit.
= $ 1,780.00
Water Meter Fee (Irrigation)
2 - 1 1/2" Irrigation Meters @ $ 157.00 ea
100% due prior to issuance of water meters.
= $ 314.00
Water Meter Deposit
Residential - 80 meters @ $30.00 ea = $ 2,400.00
100% due prior to issuance ob building permit.
Irrigation i~¥~ ~o~
2 meters @ $ 35.00 ea = $ 70.00
100% due prior to issuance of water meters.
street Lighting Fee
Shall be assessed and paird prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the propsed project. Once
plan is submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
80 Residential Lots at $150.00 each = $ 12,000.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc:
Steven G. Goram
Director of Public Works
DEVFEES . HLP
STREET SIGN ASSESSMENT
for Huntinqton Ridqe
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10 11 $584.10
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60 I 11.60
Stop & Street Combo $96.85 5 484.25
OTHER
No outlet 11.60 1 11.60
TOTAL $1,091.55
Cost breakdowns may be obtained from Public Works by written
request.
Revised 12/15/92
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
January 21, 1993
Doug Stevens, Eng. Technician
Rey Gonzales, Streets Superintendent~
Street Light Assessment - Hunnington Ridge
The following assessment represents the number of light units as
established by T.U. Electric for this subdivision. Please insure
that the developer receives a copy of this assessment and that the
fee is paid prior to final acceptance. Thank you.
13 lights @ $292.60 per light - $3,803.80
If you have any questions, please call.
RG/bc
cc: Central File
STLTHUN.RG