Loading...
WA9302-CN 960220 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7g00 ROSS L. IACOBS, RONALD V. CONV~RY, RE. IOHN W. BIRKHOFF, RE. IOE R. CARTER, RE. GARY C. HENDIIICKS, RE. c. L. SH~EK, ~. February 20, 1996 I. C. FINKLEA, I~. JAMES E. LAUGHLIN, I~. Construction Inspector City of Coppull [ C~ . .e,,~ · P.O. Box 478 ~ ~c~) . Coppell, Texas 75019-4409 Re: Village Parkway Ground Storage Reservoir No. Change Order Number 1 Dear Mr. Davis: As discussed in our January 23, 1996, meeting with the City of Coppell and Natgun Corporation, a possible method of resolving the outstanding payments due Gee Consultants, Inc. is through a negotiated change order that provides for some of the payment by the City with the balance to be paid by Natgun. Enclosed is a copy of proposed Change Order No. 1 and Richard Gee's invoices sent to Natgun. The payments due Gee Consultants, Inc. are a result of over time charges on the continuous inspection of piers, the Saturday concrete floor placement and the additional technician need for the casting of the dome and wall panels. The current agreement between the City and Gee Consultants, Inc. dose not provide for any overtime expenditures. On the September :25, 1995, invoice it is our opinion that the City may pay for regular time pier inspection cancellations and Natgun should pay for all overtime associated with the continuous pier inspections and overtime pier inspections cancellations. The following is a summary of payment due Gee Consultants for the September 25, invoice. · September 2S~ 199S: Total Amount due $734.42 City of Coppell Change Order No. 1: $282.62 Natgun Payment For Difference: $451.80 On the September 26, 1995, invoice it is our opinion that Natgun should pay for all overtime charges associated with the continuous inspection of piers. The following is a summary of payment due Gee Consultants for the October :26, invoice. · October 26, 1995: Total Amount due $712.84 Natgun Payment For Overtime: $712.84 Mr. Larry Davis .(2ity of Coppell Page 2 On the November 27, 1995, invoice it is our opinion that the City may pay for regular time pier inspection cancellations and Natgun should pay for all overtime associated with the continuous pier inspections and overtime pier inspections cancellations. The following is a summary of payment due Gee Consultants for the November 27, invoice. · November 27, 1995: Total Amount due $300.32 City of Coppell Change Order No. 1: $ 66.94 Natgun Payment For Difference: $233.38 The December 26, 1995, invoice includes the overtime associated with the Saturday, December 9, 1995, 1700 cubic yard concrete tank floor placement. The Saturday pour was at the request of the City and it is our opinion that the City may pay for the overtime. The following is a summary of payment due Gee Consultants for the December 26, invoice. · December 26, 1995: Total Amount due $339.86 City of Coppell Change Order No. 1: $339.86 The January 26, 1996, invoice includes charges for concrete mix inspection, overtime concrete mix inspection, trips to the site, additional concrete cylinders and cylinder molds for field hold cylinders· Natgun has agreed to pay for concrete cylinders and concrete molds for field hold cylinders. It is our opinion the Natgun should also pay the additional charges for overtime and the City may pay for the concrete mix inspection and trip charges. The following is a summary of payment due Gee Consultants for the January 26, invoice. · January 26, 1996: Total Amount due $4,852.26 City of Coppell Change Order No. 1: $2,999.82 Natgun Payment For Difference: $1,852.44 Based on our opinion of payment for the outstanding balances due Gee Consultants, Inc., we recommend the City pay a portion of the balance through a negotiated change order in the amount of $3,689.24, with the difference of payment made by Natgun Corporation in the amount of $3,250.46. Natgun has identified additional potential costs in the amount of $3,260.00 for additional dome concrete testing, a shotcrete test panel and additional shotcrete testing for the remaining portions of the project. IfNatgun requires the additional testing for any of these items to assure or guarantee the finished product, we recommend it be at their own expense. Please review the enclosed Richard Gee invoices and our suggested change order amount and notify us if the proposed Change Order No. 1 is acceptable to the City. We are available to discuss the proposed change order further at your convenience· 7 ~ ; Sincere ~/"; / · ~/~ri~k~' . '. ~ Enclosures CITY OF COPPELL, TEXAS VILLAGE PARKWAY GROUND STORAGE RESERVOIR NO. 2 CHANGE ORDER NO. 1 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Natgun Corporation, 11 Teal Road, Wakefield, Massachusetts 01880-12592, for construction of the Village Parkway Ground Storage Reservoir No. 2, dated May 23, 1995. B. DESCRIPTION OF CHANGE Change Order No. 1 covers overtime charges, cancellations and additional testing services not anticipated in the original scope of work. Natgun Corporation will pay Gee Consultants the outstanding balance due for invoices dated September 25, 1995 through January 26, 1996 totaling $6,939.76. The City of Coppell will reimburse Natgun Corporation for a portion of the additional testing in the lump sum amount shown below. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item I Original I Quantity Revised Unit Amount No. Description Quantity This C.O. Quantity Unit Price of Change 15 Additional Testing Services and 0 1 1 L.S. $3,689.24 $3,689.24 Overtime charges Total: $3,689.24 Original Contract Amount $2,809,305.00 Amount, Change Order No. 1 3,689.24 Revised Contract Amount $2,812,994.24 D. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will add no additional calendar days to this project. Original Contract Time 300 calendar days Time, Change Order No. 1 0 calendar days Revised Contract Time 300 calendar days 2/20/96 Page I of 2 E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell and Natgun Corporation, do hereby agree to append this Change Order No. 1 to the original contract between themselves, dated May 23, 1995. City of Coppell, Texas Natgun Corporation Owner Contractor By: By: Date: Date: Attest: Attest: 2/20/96 Page 2 of 2 ~ ~ ~3003 02,'14/'96 ~:ED 17:46 FAX 61722' 3 NATGUN GEE Consultants, Inc. 2540 6handa Lane. Suits log Dalhs, Texas 7:5229 To: Mr. Bob Barbarisi, Jr. Invoice No.: 5258-i Nat~un Corporation Invoice Dale: September 25, 1995 B~'ven Teal Road Wakefield, MA 01$80-129'2 Project: Fie. ld and Laboratory Testing Pa-form~d Sept~mb~, 1995 6.0 MG around Water Storage Tank Coppe. ll, TeT.~s Tsn~s: Due Upon Date of Samplin$ Description Quantity Rate Total 08-28--9~ Pier Insp~'fivn, Over time rite (before 7:t0 sin, after 5:00 pro) 1.5 his ~0.16 $60.24 08-29-95 Pier Inspeaion Cancellation 2.75 hrs $29,?5 $81.81 0840-95 Pier Insp~ctbn, over time 0.5 hrs $40.16 $20.08 Codore 7;30 am, attar 5:00 pro) 0841-95 Pier Inspection, over time (b~fore 7;30 am, aiter 7:00 pm) 1.0 h~s I.~0,16 $40.16 09-05-95 Pier Inspection, over time 0,75 hrs ~,0.16 $30.12 Coe. fOre 7;30 am, after 5:00 l~m) 09-06-95 Pier Ilhspe~tion, o~er rims 0.75 hrs $44~. 16 $30. (before 7:30 azn, after 5:00 09-07-95 Pi~ Inspeaion, over time 0.5 hn Cobfore 7:SO am. at~ 5:(10 pro) . $40.16 $20,08 09-11-95 Pier Inspection, Over time (before 7:~0 1.0 tus $40.16 $40. I6 am, a/ter ~:00 09-14-95 Pier Inspection, Over time (before 7:30 0.2~ hrs $40.145 $10.04 am, after 5:00 pxn) 09-15-95 Pier impsorion, Over ttm~ (before 7:30 0.7~ hrs $40.16 $30. I2 am, ather 5:00 09-1~-95 Pier Inspection, Over time Coefo~e 7:30 0.5 hrs $44].16 am, arts 5:00 pro) 09-19-95 Pi=r Insp~-tion Cancellation. R~gu!nr time 4.0 hrs $29.75 $119.00