Loading...
IAAM-LR 990730 (2)REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 ~ Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX; 972/406-8023 TESTED FOR FRANK DALE CONSTRUCTION, INC. DATE 7/30/99 SOUTHLAKE, TEXAS PROJECT IAAM HEADQUARTERS BUILDING OUR REPORT NO. 99571-10A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OP[IMUM MAXIMUM LAB IN PLACE ~N PLACE PERCENT NO DATE DEPTH ~ NIJMBER M~,~SlU~ !)RY I)ENSIT¥ MOI.'~TiJHI [)HY I){NSI]Y COMPAC]'ION COMMENT* 72 7/30/99 FG 2 23.8 94.5 26.4 89 94 1-B 73 7/30/99 FG 2 23.8 94.5 25.4 90 95' 1-A 74 7/30/99 FG 2 23.8 94.5 25.2 90 95 1 -A 75 7/30/99 FG 2 23.8 94.5 25.4 90 95 I-A 76 7/30/99 FG 2 23.8 94.5 23.9 92 97 1 -A 77 7/30/99 FG 2 23.8 94.5 25.2 90 95 1 -A 78 7/30/99 FG 2 23.8 94.5 24.1 94 99 I-A TEST LOCATION: 72 PARKING AREA - 375' SOUTH AND 50' WEST OF NORTHEAST CORNER 73 PARKING AREA - 25' SOUTH AND 150' WEST OF NORTHEAST CORNER 74 PARKING AREA - 75' SOUTH AND 150' WEST OF NORTHEAST CORNER 75 PARKING AREA - 125' SOUTH AND 150' WEST OF NORTHEAST CORNER 76 PARKING AREA - 175' SOUTH AND 150' WEST OF NORTHEAST CORNER 77 PARKING AREA - 225' SOUTH AND 150' WEST OF NORTHEAST CORNER 78 PARKING AREA - 275' SOUTH AND 150' WEST OF NORTHEAST CORNER 2 NATURAL SUBGRAO~ B~ PERCENT COMPACTION DOES NO'~ COMPLY WITH SPECIFICATIONS 3 LIME SIABILIZ£D C PERCENT IN PLACE MOISTURE gOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT iREAIED D. RETESI ~A,,~STING, INC. y Geotechnical Engineering · Construction Matedats Te~ng · Environmental Engineering · Consulting