IAAM-LR 990730 (2)REPORT OF FIELD
ALPHA TESTING, INC. COMPACTION TESTS
2209 Wisconsin St., Suite 100 ~
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX; 972/406-8023
TESTED FOR FRANK DALE CONSTRUCTION, INC. DATE 7/30/99
SOUTHLAKE, TEXAS
PROJECT IAAM HEADQUARTERS BUILDING OUR REPORT NO. 99571-10A
COPPELL, TEXAS
TEST DATA:
TEST ~ ELEV. SOIL ID OP[IMUM MAXIMUM LAB IN PLACE ~N PLACE PERCENT
NO DATE DEPTH ~ NIJMBER M~,~SlU~ !)RY I)ENSIT¥ MOI.'~TiJHI [)HY I){NSI]Y COMPAC]'ION COMMENT*
72 7/30/99 FG 2 23.8 94.5 26.4 89 94 1-B
73 7/30/99 FG 2 23.8 94.5 25.4 90 95' 1-A
74 7/30/99 FG 2 23.8 94.5 25.2 90 95 1 -A
75 7/30/99 FG 2 23.8 94.5 25.4 90 95 I-A
76 7/30/99 FG 2 23.8 94.5 23.9 92 97 1 -A
77 7/30/99 FG 2 23.8 94.5 25.2 90 95 1 -A
78 7/30/99 FG 2 23.8 94.5 24.1 94 99 I-A
TEST LOCATION:
72 PARKING AREA - 375' SOUTH AND 50' WEST OF NORTHEAST CORNER
73 PARKING AREA - 25' SOUTH AND 150' WEST OF NORTHEAST CORNER
74 PARKING AREA - 75' SOUTH AND 150' WEST OF NORTHEAST CORNER
75 PARKING AREA - 125' SOUTH AND 150' WEST OF NORTHEAST CORNER
76 PARKING AREA - 175' SOUTH AND 150' WEST OF NORTHEAST CORNER
77 PARKING AREA - 225' SOUTH AND 150' WEST OF NORTHEAST CORNER
78 PARKING AREA - 275' SOUTH AND 150' WEST OF NORTHEAST CORNER
2 NATURAL SUBGRAO~ B~ PERCENT COMPACTION DOES NO'~ COMPLY WITH SPECIFICATIONS
3 LIME SIABILIZ£D C PERCENT IN PLACE MOISTURE gOES NOT COMPLY WITH SPECIFICATIONS
4 CEMENT iREAIED D. RETESI ~A,,~STING, INC. y
Geotechnical Engineering · Construction Matedats Te~ng · Environmental Engineering · Consulting