Loading...
Gulf Bearing-CS 950208The City With A Beautiful F~ruary8,1995 P. O. Box 478 Coppell, Texas 75019 214 - 462-0022 FAX 214 - 393-0948 Ross Ramsey 501 Industrial Blvd. Grapevine, Texas 76051-3999 RE: Gulf United Industries Addition Development Fee Assessment Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Gulf United Industries Addition. Please make payment to the City of Coppell in the amount of $ 78.993.80 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer cc; Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager CITY OF COPPELL DEVELOPMENT FEES Date: February 8, 1995 Project: Gulf United Industries Addition TOTAL AMOUNT DUE ~ PRIOR TO COUNCIL Water Impact Fee 17,225.00 17,225.00 (100% due prior to Council Approval) Water Tap Inspection Fee 400.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 7,200.00 7,200.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee N/A (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 347.43 (100% due at Issuance of Water Meter) Water Meter Deposit 105.00 (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 2,551.65 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee N/A (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee N/A Street Escrow/Roadway Impact Fee 54,568.80 54,568.80 (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $82,482.88 $78,993,80 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING MEMORANDUM DATE TO: FROM RE: February 3, 1995 Mike Martin, Grad. Engineer Howard Pafford, Utilities Superintendent~ Development Fees for Gulf Bearing The following fees referenced project. Water Impact Fee: should be assessed and collected .'on the above 2 - 2" Domestic Meter/s = 16 ESU's 1 - ~" Irrigation Meter/s = 8 ESU's 1 - 6" Fireline Meter/s = 2.5 ESU's Total 26.5 ESU's ~ $650.00 ea = $ 57,225.00 100% due prior to Council approval of the final plat. Wastewater Impact 2 - ~" Domestic Meter/s = 16 ESU's Total 16 ESU's ~ $450.00 ea = $ 7,200.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each = $400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots ~ $50.00/lot = smQ.oo 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 2 - ~, Domestic Meters ~ 7~ = $$47.45 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 2" Irrigation Meter/s ~ $~73.65 ea = $173,65 1 - 8" Fireline Meter/s ~ $ 2,$78.00 ea = $2.$78.00 100% due prior to issuance of water meter/s. Water Meter Deposit (~ulti-Family or Hon-Residential) $ Meters ~ $$5~00 ea = $105.00 100% due prior to issuance of water meters. Irrigation WeterDeposit 1 Meters @ $$5~00 ea = $$5.00 100% due prior to issuance of water meters. ESCROW / ROADWAY IMPACT FEE CALCULATIONS DATE: February 7, 1995 PROJECT: Gulf United Industries Addition (Gulf Bearing) ESCROW: Street type P6D Street Name/s Bethel Road Cost per Foot $160.00 663.51 ft. Lenght of Adjacent Frontage Escrow due = (Cost per Foot) x (Lenght of Adjacent Frontage) = $106,161.60 ROADWAY IMPACT FEE: IIService Area Category Land Use #4* Industrial ** General Light Industrial ** Building Size 171,600 sq. ft. Development Units Vehicle Miles per Development Unit Fee per Vehicle Mile 171,600/1000= 171.6 $300 Roadway Impact Fee = (Development Units) x (Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $54,568.80 Amount due is the lesser of the Street Escrow or the Roadway Impact Fee. AMOUNT DUE: $54,568.80 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)