IAAM-LR 990728 ALPHA TESTING, INC.
220g Wisco, s# St., S ,#e DALLY FIELD REPORT
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
TESTED FOR: FRANK DALE CONSTRUCTION, INC. DATE: 07/28/99
SOUTHLAKE, TEXAS
PROJECT: IAAM HEADQUARTERS BUILDING OUR REPORT NO: 99571-6
COPPELL, TEXAS
TECHNICIAN: J.B.
WEATHER: CLEAR TEMPERATURE RANGE: 80 TO 100
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS, THE
SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION:
STOCKPILE OF IMPORTED MATERIAL
ATOTALOF 16 FIELD DENSITY TESTS WERE PERFORMED ON FILL FOR PARKING AREA. SEE ATTACHED
REPORT FOR RESULTS OF FIELD COMPACTION TESTING.
LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE
REPORT.
STEVE P. WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
TING,
Geotechnical Engineering · Construction Materials Tesflhg · Environmental Engineering · Consulting