Loading...
WA9302-CS 960319SHIMEK, JACOt, S FINKLEA CONSTRUCTION REPORT Prepared By: Matt Hickey ~N{N~V-~ Project No. 94155 Date: 3/19/96 Is This A Working Day? [] Yes [] No Owner: City of Coppell Contractor: NATGUN Superintendent: Jim Fisher Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Time Allotted: 300 Used: 241 Number Men Working: 10+/- Hours: 2:00 AM tO 3:00 PM Weather Conditions: Clear and Cool Site Conditions: The site was dry and well maintained. WORK DESCRIPTION 1. The first wire wrap was being put into place at approximately 17'-6" off the finished floor elevation. 2. General clean up around the tank site and inside the tank was underway. 3. The scaffolding was being removed from the tank and the job site. cc: Mr. Bob Barbarisi, Jr.