Loading...
Gulf Bearing-CS 950118The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 Jal~Jary18, 1995 Daniel Lim Brockette, Davis, Drake Inc. Consulting Engineers 4144 N. Central Expressway, Suite 1100 Dallas, Texas 75204 RE: Gulf Bearing Construction Plans Dear Mr. Lim: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. Provide a copy of current final plat. 2. Address comment made by Rick Wieland on Sheet C-4. Provide any necessary note on plans to address this comment. 3. Show inlet locations and drainage system on drainage area map. 4. How will storm drainage "Line B" be connected to existing system in Royal Lane. Provide necessary notes and/or detail. 5. Address the comments made by Howard Pafford regarding the meter sizes and the type of valve (see Sheet C-8). 6. Denote the use of stabilized construction entrances on erosion control plan. 7. There is an unclear note on water/sanitary sewer plan sheet regarding sewerline connection in median. Also, sanitary sewer line to be concrete encased if it crosses the existing water line within 24 inches. There are various other minor comments throughout these plans. Once these comments have been addressed, the revised set of plans should be resubmitted to the City for review. If you should have any questions concerning these comments, please feel free to contact me at your convenience. Sincerely, . , ~/, . Michael A. Martin, E.I.T. Graduate Engineer