Loading...
Gunner P2-CS000303 Carson-Salcedo-McWilllams, Inc. CONSULTING CIVIL ENGINEERS - LAND SURVEYORS March 3, 2000 DAU_~S FORT WORTH Richard Clmon, Jr., p.l:: City of Coppell ~ v~o. ~.,,/~,~ P.O. Box 478 M.~ McWll#am. P.E. Coppell, Texas 75019 Attention:Kent M. Collins, PE Civil Engineer Subject: GUNNER SUBDIVISION, PHASE H THIRD SUBMITTAL Dear Mr. Collins: This letter is in response to City comments made on the second review of Gunner Subdivision, Phase II: · The detail pertaining to the building plan was kept on the civil plans for grading purposes only; · Application tbr flood plain development is enclosed; · Storm line "G" and the laterals have been resized to handle 100 year storm; · The hydraulic grade line on storm line "C" has been modified; · Concrete encasements have been provided for utilities within two (2) feet of each other; · Combination meters have been placed on the water plans; · Note 9 was removed as it had already been done in Phase I of the project; · Missing waterline on westem edge of property has been located on drawing; · Sanitary manholes have been adjusted accordingly. These comments have all been addressed and we are now submitting plans for third review. Should you have any questions or comments, please contact us at your convenience. Sincerely, Carson-Salcedo-Mc Williams, Inc. Stephanie Laughlin, EIT 1201 MAIN STREET, SUITE 1530 DALLAS, TEXAS 78202 (214) 741.4~40 FAX (214) 741-4610 http:llwww.csm.net.com · ~==== Copoel!. Texas 75019 (~ ~ The City With A Beautiful Future 972-462-0022 (~ /L.~.~ RO. BOX 478 COPPELL. TEXAS 75019 February 23, 2000 Jorge Gonzales Carson Salcedo McWilliams 1201 Main Street, Suite 1530 Dallas, Texas 75202 RE: Gunner Subdivision, Phase II Dear Mr. Gonzales: The City of Coppell has reviewed the referenced plans and has the following comments to offer: 1. Any details that pertain to the building plans should be removed from the civil set. 2. A floodplain development permit will be required prior to doing any work in the 100-year floodplain. 3. Storm drain Line G and the laterals that feed it need to be sized to handle 100-year storm. No standing water will be allowed in the platted fire lane. Also, if detention is being proposed in any open areas, those areas need to be identified on the grading plan and the drainage plan. 4. The hydraulic grade line shown on Line C needs to be reevaluated. 5. Provide 2' minimum clearance between utility crossings or provide concrete encasing. 6. Combination water meters must be used for this development per the City Utility Department. Domestic water cannot be pulled from a full-flow 8" fire line. 7. Note 9 on the Water and Wastewater Plan needs to be examined. Based on as-built plans provided for Gunner Phase I, this connection has already been made. 8. On the Water line plan, the water line located on the western edge of the property is missing from the plan. 9. Be aware that 5' diameter sanitary sewer manholes are only required for manholes deeper than 12.5'. There are various other minor comments throughout the plans. VChen all comments have been addressed, please return these marked plans and two sets of revised plans to the City for review. If you have any questions, please contact me at (972) 304-7019. Sincerely, Kent M. Collins, P.E. Civil Engineer