Loading...
IAAM-LR 990819 REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 ~ Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR FRANK DALE CONSTRUCTION, INC. DATE 8/19/99 SOUTHLAKE, TEXAS PROJECT IAAM HEADQUARTERS BUILDING OUR REPORT NO. 99571-23 COPPELL, TEXAS TEST DATA: TEST '"~ ELEV, SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH'~ NUMBER MOISTURE DRY DENSFPr' MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 147 8/19/99 FG-3.0 2 23.8 94.5 24.8 90 95 1-A 148 8/19/99 FG-2.3 2 23.8 94.5 25.5 90 95 1-A 149 8/19/99 FG-1.7 2 23.8 94.5 23.8 91 96 1-A 150 8/19/99 FG-1.0 2 23.8 94.5 25.5 90 95 1 -A 151 8/19/99 FG-0.3 1 27.0 90 27.4 87 97 1-A 152 8/19/99 FG 1 27.0 90 28.5 86 96 1-A 153 8/19/99 FG-3.0 2 23.8 94.5 25.0 90 95 1 -A TEST LOCATION: I 147 ISTORM SEWER LINE A AT STATION #2+50 148 STORM SEWER LINE A AT STATION #2+53 149 STORM SEWER LINE A AT STATION #2+55 150 STORM SEWER LINE A AT STATION #2+57 151 STORM SEWER LINE A AT STATION #2+60 152 STORM SEWER LINE A AT STATION #2+65 ' 153 STORM SEWER LINE A AT STATION #5+75 1. FILL * A, IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLYWITH SPECIFICATIONS ResDectfuJlv~uJa~,~t~e~i_ 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulhhg