Loading...
IAAM-LR 990813 (2) REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 220~ Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR FRANK DALE CONSTRUCTION, INC. DATE 8/13/99 SOUTHLAKE, TEXAS PROJECT IAAM HEADQUARTERS BUILDING OUR REPORT NO. 99571-21A COPPELL, TEXAS TEST DATA: TEST LEV. SOIL ID OPTIMUM MAX}MUM LAB iN PLACE IN PLACE PERCEN[ NO. DATE DEPTH ~ NUMBER MOISTURE DRY DENSITY MOISTUHE DRY DENSITY COMPACTION COMMENT % PCF % PCF 130 8/13/99 FG 4 12.7 113.8 14.8 111 97 1-A 131 8/13/99 FG-1.5 4 12.7 113.8 15.2 110 97 1-A 132 8/13199 FG-1.0 4 12.7 113.8 14.2 111 98 1-A 133 8/13/99 FG-0.5 4 12.7 113.8 14.6 111 97 1 -A 134 8/13~99 FG 4 12.7 113.8 13.9 112 99 1-A 135 8113~99 FG-1.5 4 12.7 113.8 13.8 112 98 1 -A 136 8/13/99 FG-1.0 4 12.7 113.8 14.2 112 98 1 -A TEST LOCATION: 130 IBUILDING PAD - 75' EAST AND 60' SOUTH OF NORTHWEST CORNER 131 !BUILDING PAD - 120' EAST AND 20' SOUTH OF NORTHWEST CORNER 132 BUILDING PAD - 120' EAST AND 20' SOUTH OF NORTHWEST CORNER 133 BUILDING PAD - 120' EAST AND 20' SOUTH OF NORTHWEST CORNER 134 BUILDING PAD - 120' EAST AND 20' SOUTH OF NORTHWEST CORNER 135 BUILDING PAD - 120' EAST AND 60' SOUTH OF NORTHWEST CORNER 136 BUILDING PAD - 120' EAST AND 60' SOUTH OF NORTHWEST CORNER ] EILL * A. IN PLACE PERCENT MOISIURE AND PERCENT COMPACTION COMPLY WIIH SPEClFICArfONS 2 NATURAL SUBGRADE B. PERCEN] COMPACTION DOES NO1' COMPLY WIIH SPECIFICAIIONS 3. LIME SIABILIZED C PERCEN! IN PLACE MOISTURE DOES NOI COMPLY WITH SPECIFICA]IONS 4 CEMENI ~REAIED D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consutfing