Loading...
IAAM-LR 990812 (2) REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wiscof~Sin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR FRANK DALE CONSTRUCTION, INC. DATE 8/12/99 SOUTHLAKE, TEXAS PROJECT IAAM HEADQUARTERS BUILDING OUR REPORT NO. 99571-19 COPPELL, TEXAS TEST DATA: * PRE- INJECTION TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE~DEPTH ~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSIrY COMPACTION COMMENT* % PCF % PCF 107 8/12/99 FG * 2 23.8 94.5 26.7 91 96 1 -A 108 8/12199 FG * 2 23.8 94.5 24.2 92 97' 1 -A 109 8/12/99 FG * 2 23.8 94.5 25.0 92 97 1 -A 110 8/12/99 FG * 2 23.8 94.5 23.9 93 99 I-A 111 8/12/99 FG * 2 23.8 94.5 26.7 91 97 I-A 112 8/12/99 FG * 2 23.8 94.5 25.4 91 96 I-A 113 8/12/99 FG * 2 23.8 94.5 25.0 92 97 I-A TEST LOCATION: 107 BUILDING PAD - 20' SOUTH AND 30' EAST OF NORTHWEST CORNER 108 BUILDING PAD - 20' SOUTH AND 80' EAST OF NORTHWEST CORNER 109 BUILDING PAD - 20' SOUTH AND 130' EAST OF NORTHWEST CORNER 110 BUILDING PAD - 20' SOUTH AND 180' EAST OF NORTHWEST CORNER 111 BUILDING PAD - 60' SOUTH AND 30' EAST OF NORTHWEST CORNER 112 ,BUILDING PAD - 60' SOUTH AND 80' EAST OF NORTHWEST CORNER 113 BUILDING PAD - 60' SOUTH AND 130' EAST OF NORTHWEST CORNER ]. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICA lIONS 2. NATURAL SUBGRAOE B. PERCENT COMPACTION rJOES NOT COMPLY WITH SPECIFICATIONS ~tj~~e 3 LIME SIABILIZED C PERCENT IN PLACE MOISTURE DOES NOI COMPLY WITH SPECIFICATIONS Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting