IAAM-LR 990812 (5) ALPHA TESTING, INC.
2209WisconsinSt.,Suite 100 ' DALLY FIELD REPORT
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
TESTED FOR: FRANK DALE CONSTRUCTION, INC. DATE: 08/1 2/99
SOUTHLAKE, TEXAS
PROJECT: IAAM HEADQUARTERS BUILDING OUR REPORT NO: 99571-1 7
COPPELL, TEXAS
TECHNICIAN: K.C.
WEATHER: CLEAR TEMPERATURE RANGE: 98
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALY'SIS. THE
SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION:
STOCKPILE OF IMPORTED MATERIAL
ATOTALOF 2 FIELD DENSITY TESTS WERE PERFORMED ON SELECT FILL FOR BUILDING PAD. SEE ATTACHED
REPORT FOR RESULTS OF FIELD COMPACTION TESTING.
LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE
REPORT.
RODMAN REPRESENTATIVES WERE INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
Respectfully Submitted,
?, ,.
ALPHA TESTING, INC.
Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consutfing