Loading...
WA9302-CS 960409SHIMEK, JACOB & FINKLEA CONSTRUCTION REPORT Prepared _~ By: Matt Hickey ~'Y~ - Project No. 94155 Date: 4/9/96 Is This A Working Day? [] Yes [] No Owner: City of Coppell Contractor: NATGUN Superintendent: Jim Fisher Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Time Allotted: 300 Used: 262 Number Men Working: 7 Hours: 9:30 AM tO 10:00 AM Weather Conditions: Clear and Cool Site Conditions: The site was dry and well maintained. WORK DESCRIPTION 1. All of the prestressing wraps are in place. 2. The temporary wall manholes are sealed. 3. The final applications of shotcrete were being placed on the exterior of the tank. 4. Larry Davis and Ted Dutt selected the color of the exterior paint and the type of brick that will be used on the pilasters. 5. The second piece of the manhole ring was being installed. 6. The City indicated that it would supply Jim Fisher the irrigation piping plan so that he may begin restoring the sprinkler system to the front of the pump station. cc: Mr. Bob Barbarisi, Jr.