Loading...
IAAM-LR 990731 (4) REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 ~ Dallas, Texas 75229 972/620-8911 - 972/263-4937 CMetro) FAX: 972/406-8023 TESTED FOR FRANK DALE CONSTRUCTION, INC. DATE 7/31/99 SOUTHLAKE, TEXAS PROJECT IAAM HEADQUARTERS BUILDING OUR REPORT NO. 99571-125 COPPELL, TEXAS TEST DATA: TEST ~~ELEV. I SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE P~RCENT NO. DATE DEPTH ~ NUMBER MOISTUR£ DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 93 7/31/99 SG 1 27.0 90 27.5 89 99 2-A 94 7/31/99 FG 2 23.8 94.5 25.0 90 95 ' 1-A 95 7/31/99 SG 1 27.0 90 28.2 89 99 2-A 96 7/31/99 FG 2 23.8 94.5 26.2 90 95 I-A 97 7/31/99 SG 1 27.0 90 29.8 88 97 2-A .,98 7t31/99 SG +0.5 2 23.8 94.5 25.8 90 95 I-A 99 7/31/99 SG + 1.0 2 23.8 94.5 25.4 91 96 1 -A TEST LOCATION: 93 BUILDING PAD - 60' SOUTH AND 120' WEST OF NORTHEAST CORNER 94 BUILDING PAD - 60' SOUTH AND 120' WEST OF NORTHEAST CORNER 95 BUILDING PAD - 60' SOUTH AND 170' WEST OF NORTHEAST CORNER 96 BUILDING PAD - 60' SOUTH AND 170' WEST OF NORTHEAST CORNER 97 FIRE LANE - 30' WEST OF NORTHWEST CORNER BUILDING PAD 98 FIRE LANE - 30' WEST OF NORTHWEST CORNER BUILDING PAD 99 FIRE LANE - 30' WEST OF NORTHWEST CORNER BUILDING PAD ] FILL * A. INPLACE PERCEN] MOIS'UREANOPERCENT COMPAC,ION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B, PERCENT COMPACI'ION DOES NO~ COMPLY WITH SPECIFICATIONS ' 3 LIME STABILIZED C. PERCENT IN P[AC{~ MOISTURE DOES NO! COMPLY WITH SPECIFICATIONS 4. CEMENt [REAIED L~. RETEST Geotechnical Engineering · ConsfTuCfion Materials Testing · Environmental Engineering · Consulting