Loading...
IAAM-LR 990917ALPHA TESTING, INC. 2209 Wisconsin St.. Suite 100 REPORT OF PIER MONITORING Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: Frank Dale Construction, Inc. DATE: 9/17/99 Southlake, Texas OUR REPORT NUMBER: 99571-47 ARCHITECT: GENERAL CONTRACTOR: Frank Dale Constr. PROJECT: ~AAM Headquarters Bldg. PIER CONTRACTOR: Wylie Ddlling Coppell, Texas CONCRETE SUPPLIER: T X I Pier Information: P-1 P-1 P-1 P-1 P,er Des~gnat3on C-2 A.4-8.1 A.9-8.1 B.5-7.8 o.,. ~.r D~,ed 17-Sep 17-Sep 17-Sep 17-Sep D,t, Co,c,.~, ~,ced 17-Sep 17-Sep 17-Sep 17-Sep sh., D,..~.,- D~., ^~.,, i. 24 26 24127 24 J 26 24 27 G,o~.~ s.~-~ ~o. 99.6 99.6 99.6 99.6 To, o~ ,~.r E~o.-~..,~. 97.0 97.5 97.5 97.5 Bottom of Pier Eiev'atlon-Design, Actual. ft 47.6 46.7 53.0i 52.9 47.6 I 47.5 48.6 47.2 I I Dev, abon Eom Design Elevation (ft+) 0.9 0.1 0.1 1.4 v.~c., st.., ~.,.~orc,.g 4 #7's 4 #7's 4 #7's 4 #7's VemcalSteelTie Reinforcing #3°S @ 18" O.C. #3'S @ 18" O.C. #3'S @ 18" O.C. #3'S @ 18" O.C. sore,c,, (No & Lotto,) N/A N/A N/A N/A Length of Ca, s,ng used. ft 47 45.8 44.8 45.8 D.~ to ...,.g ~.t.,. 45.0 39.6 45.0 44.0 ~,,,,.~o. of ~., i,to a~.,i,g st,-,,., ft 7.9 7.1 7.1 8.4 ~o~ ~,~h D.,ed 52.9 46.7 52.1 52.4 REMARKS: Elevations as provided on plans, survey of elevations not provided by Laboratory. Respectfully Submitted Geotechnical Engineering · Cons#uction Matedats Testing · Environmental Engineering · Consulting