Loading...
IAAM-LR 990915ALPHA TESTING, INC. 2209 Wisconsin St.. Suite 100 REPORT OF PIER MONITORING Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX; 972/406-8023 TESTED FOR: Frank Dale Construction, Inc. DATE: 9/15/99 Southlake, Texas OUR REPORT NUMBER: 99571-39 ARCHITECT: GENERAL CONTRACTOR: Frank Dale Constr. PROJECT: ~AAM Headquarters Bldg. PIER CONTRACTOR: wylie Ddlling Coppell, Texas CONCRETE SUPPLIER: T X I Pier Information: P-1 P-1 P-1 P-3 P~er O.ig.a,o. B.3 B.1-5.7 B.7-5.7 D-4 Date Pier Dnlled 15-Sep 15-Sep 15-Sep 15-Sep D.to Co.cr,. P~a~ 15-Sep 15-Sep 15-Sep 15-Sep sh., D,.m.~r- o..,,., *~.,. ,. 24 27 24127.5 24126.5 30133 o~... S.~ce E~..~o. 99.6 99.6 99.6 99.6 Top of Pier Els. vat,on-De, sign 97.0 94.5 94.5 97,5 Bottom of Pier Elevabon-Design, ^ctual, ff 46.9 46.2 46.2145.6 46.3145.4 49.3149.2 D-,.,.o. ~,o.~ o.,g. E~..,a,o. (,.) 0.7 0.6 0.9 0.1 Ve~.~ S~..~ R.~.~o,~,.~ 4 #7'S 4 #7'S 4 #7'S 6 #7'S v~c~ St..~Tie.~.~orc~.g ~k3'S ~ 18" O.C. #3'S @ 18" O.C. #3'S @ 18" O.C. /A3'S @ 18" O.C. S,,c. (No & Lo~,o,) N/A N/A N/A N/A c..g~ of c~.,., .,~.. 44.7 44.5 45.7 39.8 De~ to ..r,.~ S~.., ~ 45.7 46.4 46.3 44.3 To~I De~ Dnlled 53.4 54.0 54.2 50.4 REMARKS: Elevations as provid~ on plans, su~ey of elevations not provided by La~rato~. R~tfully Subm~ Geotechnical Engineering · Construction Matericfls Testing · Environmental Engineering · Consu~'ng