Loading...
WA9302-CS 960416SHIMEK, JACOb & FINKLEA CONSTRUCTION REPORT Prepared By: Matt Hickey Project No. 94155 Date: 4/16/96 Is This A Working Day? [] Yes [] No Owner: City of Coppell Contractor: NATGUN Superintendent: Jim Fisher Weather Conditions: Clear and Warm Site Conditions: The site was well maintained. Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Time Allotted: 300 Used: 269 Number Men Working: 12_+ Hours: 12:15 PM to 12:45 PM WORK DESCRIPTION 1. Larry Davis Requested that we get Natgun's tank loading method in writing. 2. We discussed the testing of the dome ring. A Windsor Probe Test is scheduled for Wednesday, April 17, 1996. The test will be conducted by Natgun's concrete supplier and supervised by Maxim Testing. We directed Natgun to provide us with written results from both the Swiss Hammer Test and the Windsor Probe Test. These reports will also be forwarded to Richard Gee. 3. Larry Davis approved the "Buckskin" color chip for the exterior coating system. 4. Natgun was applying the final mortar coat and was preparing to construct the brick pilasters. 5. Inlet piping construction was being installed by Natgun. cc: Mr. Bob Barbarisi, Jr.