Loading...
IAAM-LR 990914ALPHA TESTING, INC. 22o¢ wisconsin St., S,ite REPORT OF PIER MONITORING Dallas. Texos 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: Frank Dale Construction, Inc. DATE: 9/14/99 Southlake, Texas OUR REPORT NUMBER: 99571-37B ARCHITECT: GENERAL CONTRACTOR: Obsen PROJECT: IAAM Headquarters Bldg. PIER CONTRACTOR: wcie Ddlling Coppetl, Texas CONCRETE SUPPLIER: T Pier Information: LIGHT POLl P~-, ~.~.~o. 5 6 7 8 Date Pi, C;'fllted 14-Sep 14-Sep 14-Sep 14-sep ~.. co.c,~. ~,~ * 14-Sep 14-Sep 14-Sep s.,, o,.--. ,:,,,.~. ,,,~,. ,.. 24 J 24 24 24 24124 24 J 24 a,ou,~ s,~:~ el,,,r~ 99.6 99.6 99.6 99.6 Top o~ Pier E~ev"a~on-Oes~n 102.0 102.0 102.0 102.0 Sot~,,o~E~,,~o,-C~,g,~A~o.,.,.ft 93.6 92.7 93.6 92.9 93.6J 92.6 93.6 J 92.6 I I D~=,o,,~,o,, C~,,~, E~,~o, (ft+) 0.9 0.7 1.0 1.0 v~ s~ R~.~o,.~.g 4 #7'S 4 #7'S 4 #7'S 4 #7'S Vertical Steet Tie Re,forcing #3'S ~ 12" #3'S @ 12" #3'S (~ 12" #3'S (~ 12" Splmes (No. & Locabon) N/A N/A N/A N/A ~o,¢, o~ C,,in~ .~,., N/A N/A N/A N/A ~,~ ,. ~.,.. st~.. ~ 'N/A N/A N/A N/A P~,.~o, o~ P,. i~ ~ s~., ~ N/A N/A N/A N/A To~ D.~ ~,,~ 6.9 6.7 7.0 7.0 REMARKS: Elevations as provided on ~lans, survey of elevations not provided by Laboratory. · Concrete not placed on this date. Geotechnical Engineering · Construcffon Materials Testing · En~4ronmental Engineering · Consu#fng