Loading...
IAAM-LR 990914 (6)ALPHA TESTING, INC. 22o¢ w~o~#~ st.. s~#e ~oo REPORT OF PIER MONITORING Dollos. Texos 75229 972/620-8911 - 972/263-,~93 7 (Metro) FAX: 972/40(5-8023 TESTED FOR: Frank Dale Construction, Inc. DATE: 9/14/99 Southlake, Texas OUR REPORT NUMBER: 99571-35 ARCHITECT: Haldeman Powell & GENERAL CONTRACTOR: Frank Dale Constr. PROJECT: IAAM Headquarters Bldg. PIER CONTRACTOR: Wylie Ddlling Coppetl, Texas CONCRETE SUPPLIER: T X I Pier Information: P-1 Pier DeSlgnabon B-2 D.,e Pier 0.,.~ 14-Sep o.te co.:~t. P,.~d 14-Sep s,., Oi.m~,- D~,g. / ^=.,... 24 J 26 I G~o... s.~-~ E~-..o. 99.6 Top of Pier Eievabon-Design 99.4 E~3t~om of Pier EEI--t~on-Oesign / Actual. ft 45'2 I 42'0 I De~ation from Design Elevation (ft+} 3.2 Vertical Steel Reinforcing 4 #7'S Vertical Steel T~e Reinforcing #3'S ~ '18" O.C. Splices (No. & Location) N/A Length of Casing used, ft 53,8 Depth to Beanng S~ta. ft 47.4 Penetration of Pier into Bearing Strata, ft 10.2 To=~ C~pm 9n,. 57.6 REMARKS: Elevations as provided on plans, survey of elevations not provided by Laboratory. Respecfful~.~~