Loading...
WA9302-CS 960423SHIMEK, JACObcS & FINKLEA CONSTRUCTION REPORT Prepared ~y~r~ ~V~ By: Matt Hickey Project No. 94155 Date: 4/23/96 Is This A Working Day? [] Yes [] No Owner: City of Coppell Contractor: NATGUN Superintendent: Brian Phelp Weather Conditions: Clear and Warm Site Conditions: The site was well maintained. Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Time Allotted: 300 Used: 276 Number Men Working: 6 Hours: 9:40am to 10:00am WORK DESCRIPTION 1. Construction of the inlet and outlet piping for the new ground storage tank required closing the valve at the existing tank's east outlet pipe. This action did not allow the existing transducer to send pressure readings to the DWU pressure meter. In order to restore the pressure readings, a temporary 3/4 inch copper wire was connected to the existing pump station suction header blowoff valve and the DWU pressure meter. 2. The City indicated that the new transducer for the existing tank should be installed immediately. 3. The safety rail on the dome and a portion of the exterior ladder was in place. 4. Work continued on the inlet piping. 5. Work has started on the brick pilasters 6. The interior of the tank was being cleaned with a pressure wash. cc: Mr. Bob Barbarisi, Jr.