Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
IAAM-LR 990929
ALPHA TESTING, INC. 22o W scons n St., S. te ;00 REPORT OF PIER MONITORING Dallas. Texas 752.2g 972/620-8911 - 972/2d~-4937 (Metro) FAX: 972/406-8023 TESTED FOR: Frank Dale Construction, Inc. DATE: 9/29/99 Southlake, Texas OUR REPORT NUMBER: 99571-70 ARCHITECT: Haldeman Powell & Pt:nm GENERAL CONTRACTOR: Frank Dale aonstr. PROJECT: ~AAM Headquarters Bldg. PIER CONTRACTOR: wylie Drilling Coppell, Texas CONCRETE SUPPLIER: T X I Pier Information: P-1 P-1 P-1 P-1 P,e, Designabon A. 3-1 A.6-. 9 C. 4-. 9 C. 8-1 Date ~e, O.,ed 29-Sep 29-Sep 29-Sep 2g-Sep Date Concrete Placed 29-Sep 29-Sep 29-Sep 29-Sep S"a.O'.,...,-O.,..,^~,., .... 24 I 26 24 26 24 26 24 I 26 I I a .... . s.~c. e~.,~.o. 99.6 9g.6 99.6 99.6 top ot .+e, E~.,.~.o.-O.,.. 97.5 97.7 97.7 97.5 .o.o.~ o, Pie' E'--"o"-Oes,,.' ^c~',, 45.6 r 45.5 48.0 47.4 48.3 47.2 49.2 I 47.6 D-.,,at,o, ,o,~ Des,g, E~,,~,o, (,+) 0.1 0.6 1.1 1.6 vetch, s~ Re,.~o~,.g 4 #7's 4 #7's 4 #7's 4 #7's ve.ic~st.~e R.~.to,c,.g #3's @ 18" D.C. ~L3's @ 18" D.C. #-3's @ 18" o.c. #3's @ 18" D.C. Splices (No. & Location) N/A N/A N/A N/A Le.~ o~ C..,.g .~,. 47.0 44.6 47.0 44.6 Depth tO B .... g S~.=,. 47.0 44.6 44.3 43.4 Penetration of Pier into Bearing Strata, ft 7.1 7.6 8.1 8.6 T~, De,th on,ed 54.1 52.2 52.4 52.0 REMARKS: Elevations as providc~l on plan~, survey of el~vation~ not provided by Laboratory, Respectfully Submitted AIp~