IAAM-LR 990924 (4)ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100 REPORT OF PIER MONITORING ,
Dallas, Texas 75229
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/4Gfi-8023
TESTED FOR: Frank Dale Construction, Inc. DATE: 9/24/99
Southlake, Texas OUR REPORT NUMBER: 99571-61A
ARCHITECT:
GENERAL CONTRACTOR: Frank Dale Constr.
PROJECT: IAAM Headquarters Bldg. PIER CONTRACTOR: Wylie Drilling
Coppell, Texas CONCRETE SUPPLIER: T X I
Pier Information:
P-3
Pier Designation A' 5
Date Pier ~r,,. 24-Sep
Date Concrete pla~ 24-Sep
Shaft Diameter- Oes,gn ! Actual. ,n 30 33 I
I
Ground Surface ElevaBon 99.6
Top of Pier Elevat~on-DesiDn 97.5
Bosom or ,,er e~,~,on-O~ign / A~a~. ft 50.4 49.3
Deviation from Design Elevation (ft+) 1.1
Ve,'~a, Ste. I .e,.fo,c,ng 6 #7'S
Vertical Steel Tie Rmnforcmg #3'S ~ 18" D.C.
Splices (No & Locabon) N/A
.e.gth of Ca.in~ ,,,.. 39.0
Depth to Bearing Strata. ft 43.2
Penetration of Pier into Bearing Strata. ft 7.1
Total Depth Drilled 50,3
REMARKS: Elevations as provided on plans, survey of elevations not provided by Laboratory.
Respectfully Submitted
Geo~a/E~ · C~tk~ Materk~ Testing · Envh~rnenta/Eng/neerk'~g · Consu/fing