Loading...
IAAM-LR 990924 (4)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 REPORT OF PIER MONITORING , Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/4Gfi-8023 TESTED FOR: Frank Dale Construction, Inc. DATE: 9/24/99 Southlake, Texas OUR REPORT NUMBER: 99571-61A ARCHITECT: GENERAL CONTRACTOR: Frank Dale Constr. PROJECT: IAAM Headquarters Bldg. PIER CONTRACTOR: Wylie Drilling Coppell, Texas CONCRETE SUPPLIER: T X I Pier Information: P-3 Pier Designation A' 5 Date Pier ~r,,. 24-Sep Date Concrete pla~ 24-Sep Shaft Diameter- Oes,gn ! Actual. ,n 30 33 I I Ground Surface ElevaBon 99.6 Top of Pier Elevat~on-DesiDn 97.5 Bosom or ,,er e~,~,on-O~ign / A~a~. ft 50.4 49.3 Deviation from Design Elevation (ft+) 1.1 Ve,'~a, Ste. I .e,.fo,c,ng 6 #7'S Vertical Steel Tie Rmnforcmg #3'S ~ 18" D.C. Splices (No & Locabon) N/A .e.gth of Ca.in~ ,,,.. 39.0 Depth to Bearing Strata. ft 43.2 Penetration of Pier into Bearing Strata. ft 7.1 Total Depth Drilled 50,3 REMARKS: Elevations as provided on plans, survey of elevations not provided by Laboratory. Respectfully Submitted Geo~a/E~ · C~tk~ Materk~ Testing · Envh~rnenta/Eng/neerk'~g · Consu/fing