Highland Oaks-CS 860106GINN. IN(:. ¢i{}NSI'I,TIN{; ENGINEERS
January 6, 1986
Mr. David Pickett
Pickett Investments
1919 South Shiloh Road, Suite 320
Garland, Iexas 75042
.Re: Highland Oaks
Final Acceptance
Dear Mr. Pickett:
A final inspection was conducted on .December 23, 1985 for the above referenced
project by representatives of Ginn, Inc. and the City cf Coppell. Ail items to
the project are in compliance ~ith the standards set forth by the City of Coppell
subdivision requirements and are found to be acceptable to both parties. As-
built drmvings and one-year maintenance bonds have been received from both parties
with a maturity date of January 1, 1987.
Sincerely,
Randy Fleming
cc: Ed Powell, P.E., City of Coppell
~ ~tevc Gor~)
P~er Bl~ d~aI1
Jim Pitts
Treece & Company
GINN. IN(',. CONSULTING ENGINEERS
Utilities Paving
Weaver Construction Co. J.C. Boney Construction Co.
P. O. Box 29309 P.O. Box 59485
.Dallas, TX 75229 Dallas, TX 75229
214/ 247-9611 243-2348 or 620-0922
Metro: 263-2360
11350 Luna Rd. 2700 Arbuckle