Loading...
Highland Oaks-CS 860106GINN. IN(:. ¢i{}NSI'I,TIN{; ENGINEERS January 6, 1986 Mr. David Pickett Pickett Investments 1919 South Shiloh Road, Suite 320 Garland, Iexas 75042 .Re: Highland Oaks Final Acceptance Dear Mr. Pickett: A final inspection was conducted on .December 23, 1985 for the above referenced project by representatives of Ginn, Inc. and the City cf Coppell. Ail items to the project are in compliance ~ith the standards set forth by the City of Coppell subdivision requirements and are found to be acceptable to both parties. As- built drmvings and one-year maintenance bonds have been received from both parties with a maturity date of January 1, 1987. Sincerely, Randy Fleming cc: Ed Powell, P.E., City of Coppell ~ ~tevc Gor~) P~er Bl~ d~aI1 Jim Pitts Treece & Company GINN. IN(',. CONSULTING ENGINEERS Utilities Paving Weaver Construction Co. J.C. Boney Construction Co. P. O. Box 29309 P.O. Box 59485 .Dallas, TX 75229 Dallas, TX 75229 214/ 247-9611 243-2348 or 620-0922 Metro: 263-2360 11350 Luna Rd. 2700 Arbuckle