Loading...
Jefferson-CS 941103 THE NELSON CORPORATION LINDA SEWEI. L PLANNING · ENGINEERING · SURVEYING BRIAN MARCUS, P.E., ~.P.L5. SEC~.'I'it~& LANDSCAPE ARCHITECTURE · CONSTRUCTION MANAGEMENT DALLAS, TEXAS 75252 (214) 380-2605 November 3, 1994 tAX (2~4) AM:~ sKt~nX~neth M. Griffm, p.E. ~ (t~L~ VIA COURIER i City Manager/City Engineer / City of Coppell 255 Parkway Boulevard ~ 3)o~/~ ~- Coppell, Texas 75019 . J RE: JN~ff~n. 0~t Riverchase~ ~ 1!/lO[c~ rV};IO... Dear Mr. Griffin: ('~ ~ °"0"~ We respectfully request a variance from the requirement of City of Coppell Subdivision Regulations, Appendix C, Section E. 1.i to provide lime or cement modified subgrade for the parking lots and fire lanes for Jefferson at Riverchase. In lieu of providing lime or cement modified subgrade, we propose to prepare the subgrade in accordance with recommendations made in Alpha Testing, Inc. 's Geotechnical Exploration Report, dated October 3, 1994. A copy of the report is enclosed for your reference. Section 6.3.2 of the report states, that for concrete pavements, subgrade stabilization is not necessary. The report recommends that the "subgrade be scarified to a depth of at least 6 inches and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percent below to 3 percent above the material's optimum moisture content". Pursuant to Section E.l.a of the Subdivision Regulations, we respectfully request you accept Alpha's recommendations for subgrade preparation and grant a variance from providing lime or cement modified subgrade. Thank you for your consideration of our request. If you have any questions, please contact me at your convenience. Sincerely, THE NELSON CORPORATION Michael L. Clark, P.E. MLC/mr Enclosure cc: Guy Brignon (via fax) Heather Finlay (via fax) Tim Rodgers (via fax) Craig Cummings (via fax) Brent Little (via fax) David Lewis, P.E. (via fax) Lisa Allen G :\94046.00\a\c\Griffin4. MLC