Loading...
IAAM-CS000305Ci~ of ~11 635 Ffi~ - ~ Subj: Ci~l I~fion ,Z~ ~'P'~ ~on f~ ~ ~ W~ld H~q~, w~ ~t~ly ~u~ ~id~on ~ ~ ~. ~on ~. ~ ~a~ go~ is to ~s~ ~e Ci~ of Co~ll ~d M1 ~~ ' ~. mpl ly. ~ effom to ~ow o~ cli~ ~, ~e ~ili~ ~ be~ relomfion m ~ek new b~l~g on I'~ scheme, it ~ ~me a n~siW to ob~ a t~r~ ~fi~te of oe~p~ by ~e do~ of ~" . bmin~ Ffi~y M~ch 7, 2~. ~s ~11 fllow ~e om~ of ~e ~ World H~qm~ ~ 0 b~ mobil~fion ~ Co~ ~s w~k~d. ~./a. ~ ~e d~l ~n~, M~k M~w ofH~ffA~d~, ~s mo~g' ~d I ~11 deliv~ ~ to ~.,[ ~ , IX."-:. · e offi~ of L~ Da~s. As we disc~ y~t~day, one blue lhe s~ is r~ at ~s t~e for renew. Pro~dhg ~m no ~~m ~e r~uir~ ~ dW rehew, HflffAsmm~ will ~~ely pro,de ~ ~difio~ blue l~e s~, one myl~ s~ ~d di~ fil~. If ~fiom ~e r~u~ F~ ~11 fo~ ~e r~r~ m~fions to HflffAssociat~ to be ~m~mt~ ~d ~e a~opfi~e nmb~ of docm~m, ~ li~ above, ~11 be pro~d~ to ~e CiW of Cop~ll. We Mve mndu~ ~el~ w~ ~ou~ wi& L~ Da~s ~d have ~mplet~ most of &e it,s he ~u~t~. ~ ~n~ete sub~n~r is on site ~d we ~e a~p~g to ~mpl~e fll r~g m~fions by ~e close ofbm~ess today M~ch 6, 2~. 250 Bank Street · Southlake, TX 76092 · Phone 817-329-6100 · Fax 817-251-9195 ~ FDC Frank Oale Construcfion, /nc. Specifically, not including landscaping, we are aware of the following concrete items that remain to be completed as of this writing: 1. Terminate a short curb at the building canopy entrance sidewalk. 2. Complete a section of sidewalk, parallel to Fritz, on the west side of the site between the curb and existing utility equipment. 3. Pour back a concrete section, removed to uncover a utility valve, at the west fire lane. 4. Grade the adjacent north neighbor stockpile to accept mowing. 5. Correct the east parking lot entrance approach. Apparently the approach apron has heaved and separated from the brick paver pad. We will replace the approach apron. Items 1 through 4 should be completed today. Item 5 will be started and we will attempt to complete by close of business on Friday. The final phase of site landscaping is currently underway. The trees and most of the irrigation system was installed last fall. We are currently completing the last areas of irrigation and manicuring the grades. Planting remaining shrubbery and grass will commence, weather permitting, in approximately one week. It is our understanding that this issue is to be further addressed in separate correspondence with Lee Stone. We are confirming that our utility and concrete subcontractors have secured maintenance bonds with the City of Coppell for any installations within City easements, and under separate transmittal we are submitting the testing lab reports for the project. We appreciate your consideration and cooperation with the final stage of our project. We are thankful to have the opportunity to build this project and hope we are contracted to do future projects in the City of Coppell. If you have any questions or need any additional information, please call. I can be reached at office 817-329-6100 extension 20 or by pager 817-617-5621. Vice President - Field Operations c: Lee Stone, City of Coppell