ST9704TR-CS000501COPPELL, TEXAS 75019 May 1, 2000 RO. Box 478 Coppell, Texas 75019 972-462-0022 Mr. Jeffrey C. Bryan, President Durable Specialties, Inc. P.O. Box 381788 Duncanville, TX 75116 RE: 2"a High School Access Traffic Signal ST97-04TR Dear Mr. Bryan: Attached for your review is Change Order #1 for the referenced project. If you are in agreement with the change order please sign the three originals and return for execution by the City Manager. One original will be returned to you for you fde. I would also like to take this opportunity to remind you of a letter sent to you by Garreth Campbell on December 20, 1999 (copy enclosed). The issue outlined in the last paragraph has yet to be resolved. Since that letter was sent, the pole supporting the northbound mast arm has rotated slightly and must be secured. If you have any questions please do not hesitate to call. Your cooperation in the successful completion of this project is greatly appreciated. Assistant City Engineer cc: Garreth Campbell, Construction Inspector The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 75019 RO, Box 478 :: ..- "- Coppell, Texas 75019 972-482-0022 December 20, 1999 Mr. Jeffrey C. Bryan, President Durable Specialties, Inc. P.O. Box 381788 Duncanville, TX 75116 RE: 2"' High School Access Traffic Signal STg'/-434TR Dear ]eft: o I'm returning Durable's Invoice//827-1 for the following considerations: Item//1-6 has been completed and should be 1524 LF. Item//1-13 should be 8813 LF. Item//1-18 should be 26 LF. Item//1-21 should be 2 EA. Item//1-36 should be 2 EA. Item//1-39 should be 0 LF. Item//'s 1-40 thru 1-47 are all complete and should reflect the bid quantities. Item//1-48, the Upload/Download has been delivered, but I have been advised by our Signal Technician that it is not compatible with our system. Additionally, on two consecutive days the West bound reds were both out. Our Signal Techs replaced one of the reds balls and I have been observin~ the operation since and noticed no further problems. There is a reason they failed initially. I have spoken to Larry Laskey regarding this problem. Please give me a call when you've had time to consider these issues so they may be resolved as quickly as possible. Thank you, Construction Inspector cc: Per Birdsall, Sign/signal Technician CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: CHANGE ORDER NO.: 1 Item Description 2~ High School Access Town Center Blvd. Traffic Signal Project # ST 97-04 TR Durable Specialties, Inc. City of Coppea Unit Add: I. 25 New: I 50 Delete: I 49 12" Signal Head Section 4 Modify Signal Head 2 Assembly Relocate Power Pole DATE: 3/21/00 Unit Price Total EA 140.00 560.00 970.00 '1,940.00 Total Revision to Contract Amount 3500.00 (3,500.00) ($1,000.00) Previous contract mount Net decrease in contract amount Revised contract amount Net increase in contract time of completion Revised Contract time of completion $97,300.00 $1,ooo.oo $96,300.00 225 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract Recommenc.~y City Engineer ~-~.oO Date Agreed to by Contractor Date Approved by Owner Date