Loading...
Gulf Bearing-LR 951117TECHNOLOGIES INC Maxim Tech., Southwestern Labs 2575 Lone Star Dr. · P.O, Box 224227 Dallas, Texas 75222 Telephone; (214) 631-2700 FAX: (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CUENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 32511A DATE OFSERVICE:lO/20/95 AUTHORIZATION: ongoing REPORT DATE: 11/17/95 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000ps£ @ 28 DAY'S SLUMP: 3- 5" AIR: 3-6Z METHOD OF TEST: ASTM C-39 ASTM C- 143 PROJECT DATA CLASS OF CONCRETE: Mix Number 38 DATE OF PLACEMENT: 10/20/95 3]ME SAMPLED: 08: 00AM BY: Frank Tisdale, CET TEMPERATURE ('F) - AIR: 48 CONCRETE: 64 TRUCK NO: 391 TICKET NO: 7015037 AIR CONTENT(%): 3.0 LOCATION OF PLACEMENT: Paving, 275' and 17' west of northwest bldg. corner. CYLINDER MEASURED MARKED SLUMP DATE AGE DIAMETER SET NO. (inches) TESTED (days) (in.) 1 1 4.50 10/27/95 7 6.00 1 2 4.50 11/17/95 28 6.00 1 3 4.50 11/17/95 28 6.00 1 4 HOLD HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AREA LOAD STRENGTH (sq.in.) (lbs. force) (ps~ 28.27 105150 3720 28.27 140110 4950 28.27 137950 4880 REMARKS ADDITIONAL COMMENTS: 25 gallons of water was added prior to placement. Technician: Frank Tisdale, CET Started: 06:30AM Stopped: 12:30PM Report Of Tests Continued On Page 2 1001 LW Our letters and reports are for the exclusive use of the client .to whom they .are ad, dressed a~n_d shall not ,be ~repr,o_du_ceCl_neX. C~ePotolr~s ful without the approva of the testing laboratory: The use o! .o%r, na.m..e m_.us~_re_c.e.~_v~e..o_u_r apply only to the sample tested and/or nspectea, ana are not [nalcauve Gulf Bearing, Inc. CLIENT NO, 3200037 DATE OF SERVICE: 10/20/95 REPORT NO, PAGE 2 SET NO. 2 32511A CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 3- 5" AIR: 3 -6% METHOD OF TEST: ASTM C-39 ASTM C-143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i hued) PROJECT DATA CLASS OF CONCRETE: Mix Number 38 DATE OF PLACEMENT: 10/20/95 TIME SAMPLED: 10: 15AM BY: Frank Tisdale, CET TEMPERATURE ('F)-AIR: 59 CONCRETE: 68 TRUCK NO: 572 ~CKET NO: 7015049 AIR CONTENT(%): 4.5 LOCATION OF PLACEMENT: Paving, 100' south and and 15' west of north west building corner. CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 5.25 10/27/95 2 2 5.25 11/17/95 2 3 5.25 11/17/95 2 4 HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) (sq.in,) (lbs. force) COMPRESSIVE STRENGTH 7 6.00 28.27 91410 3230 28 6.00 28.27 110010 3890 28 6.00 28.27 117870 4170 HOLD REMARKS ADDITIONAL COMMENTS: No water added to truck. Technician: Frank Tisdale, CET Started: 06:30AM Stopped: 12:30PM Report Of Tests Continued On Page 3 1001 LW Our letters and reports are for the exclusive use of the client to whom they are addressed ~.nd shall not .be _repr.oduced ex. cept in. fiji without the approval of the testing la. boratory; The use of. pu.r, na.m,e m~us~t~ rece~v_e.~..o_? _wt. ~_e_n_.a_p~[.ov..~al_.~=_L~_[ apply only to the sample tested and/or inspecteo, ann are no! inQicaiive o¥ Lrte quarl[it e~ Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 10/20/95 REPORT NO. PAGE 3 SET NO. 3 32511A CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 3- 5" AIR: 3-6% METHOD OF TEST: ASTM C-39 ASTM C-143 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CLASS OF CONCRETE: Mix Number 38 DATE OF PLACEMENT: 10/20/95 TIME SAMPLED: 12: 30PM BY: Frank Tisdale, CET TEMPERATURE ('F) - AIR: 62 CONCRETE: 70 TRUCK NO: 282 TICKET NO: 7015059 AIR CONTENT(%): 4,2 LOCATION OF PLACEMENT: Paving, 12~ north and 35' west of northeast building corner. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. (inches) TESTED (days) {in.) (sq.in.) (lbs. force) (psi) 3 1 5.00 10/27/95 7 6.00 28.27 102220 3610 3 2 5.00 11/17/95 28 6.00 28.27 132400 4680 3 3 5.00 11/17/95 28 6.00 28.27 132210 4680 3 4 HOLD HOLD REMARKS Technician: Frank Tisdale, CET Started: N/A Stopped: 06:30AM Report Distribution: MAXIM TECH,,SOUTHWESTERN LABS (1) GuLf Bearing, Inc. (1) Gromatzky, Dupree & Associates (1) Brockette, Davis, Drake (Z) Rogers O'Brien F. King Cook, P.E. (1) City of CoppeL[ (1) City of Coppe[[ 10Ol LW Our letters and reports are for the exclusive use of_the client .to whom they .are addressed _a.n~d_ shall__n_o.~_,be ~r.e..pr,o_du_c._ed__e~xc.e~_tJn_,- fu without the approval of the testing laboratory; I n.e use oT pu.r. na.m.e m.us.l re_c.e.[v~e~_r _wr, ~_e_n_.a_p~[..ov,~,_._~[ apply only to the sample tested and/or nspecteo, and are no[ inatcaTJve OT me q~uue= om app~f~ml[ly lu~m][=~ um ~ imm ~