Loading...
Gulf Bearing-LR 951016TECHNOLOGIES INC Maxim Tech.. Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF STRUCTURAL STEEL INSPECTION CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 25632A DATE OFSERVICE:10/04/95 AUTHORIZA~ON: Joe [~tite REPORT DATE: 10/16/95 SERVICES: Perform structural steel inspection as detailed below. REPORT OF TESTS Drawings Utilized: Locations/Items Inspected= Discrepancies/Comments: Inspected as follows: 1. Structural Steel Roof Level Framing Roof level metal decking screw attachments to joist supports and also at side laps were visually determined to be complaint between column lines & to H and 10.6 to 12. This completes the metal decking inspection. Joist seat welds between column lines A to H and 9 to 12 were determined to be complaint. Joist bridging determined to be compliant between column lines ~ to H and 9 to 11.9. Bolted connections at col~m- cap plate to joist girder between column lines A to H and 7 to 12 were determined to be compliant. Report Of Tests Continued On Page 2 1099 JS Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except In apply only to the sample teszeo ano/or nspecteo, ana are no~ inOlC~lLiVe o/ Ul~ qt~culuu~a ~/ apl~m/~l,~y I~ · Gulf Bearing, Inc. CLIENT NO. 3200037 DAT~ OF SERVICE: 10/04/95 REPORT NO. 25632A PAGE 2 REPORT OF TESTS (contin~) Column anchor bolts between col~m~ lines B to G and 8 to 11 were determined to be compliant. 6. * The following structural items have not been completed at this time. Joist bridging attachment to end walls along line i ad 12 have not been installed. Midspan angle knee braces have not been installed. Joist seat support angles to side walls along line &-i to &-12 and H-1 to H-12 have not been welded at the under side angle leg to wall embed plates. Joist and joist girder bottom chord extensions have not been weld to stabilizer plates. * Discrepancies Time: 1:30 pm to 6:00 pm Technician: Randy Walcker ~ NDE-Level II tC'b~ Report Distribution: MAXIM TECH.eSOUTHWESTERN LABS (1) Gulf Bearing, Inc. (1) Gromatzky, Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers O'Brien F. King Cook., P.E. (1) City of Coppe[[ lO~lg)dsCity of Coppe[[ Our letters and reoorts are for the exclusive use ofthe cllen! ~ull ~out the approval of the testing laboratory, ine use ol' .ou.r. na~e m.us_~ recelve~..gur _~r~ ~en ap~,r.o.¥~l.~u~,r Ioerttse[mSil~a_rr~c~uOc~t~ apply only to the sample tested and/or inspecte~l, and are not ~na~cat~ve o1' ~ne quarnmes o~ apparenuy ~aermca~ or ~ p .