Loading...
Gulf Bearing-LR 951009TECHNOLOGIES INC ,vlaxim Tech., Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF STRUCTURAL STEEL INSPECTION CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 25616 DATE OF SERVICE: 9/28/95 AUTHORIZATION: Joe ~Thite REPORT DATE: 10/09/95 SERVICES: Perform structural steel inspection as detailed below. REPORT OF TESTS Drawings Utilized: Locations/Items Inspected: Discrepancies/Comments: 1. Structural Steel Roof level framing, following items. reinspection of the Column anchor bolts previously noted discrepancies reported on 9-27-95. The following items were repaired and are now determined to be compliant. ae B. C. D. E. F. At column B-2 At column B-5 At column B-6 At column D-3 At column D-5 At column G-2 Metal decking installation between column lines A to H and 7 to 8.8, reinspection of previously noted discrepancies throughout this area are now determined to be compliant. Time: 12:00 pm to 3:00 pm * Discrepancies Technician: Randy Walcker~,~%.~ NDE-Level II Report Distribution: MAXIM TECH.,SOUTHW~.~ERN LABS (1) Gulf Bearing, Inc. (1) Gromatzky, Oupree & Associates (1) Brockette, Davis, Drake (2) Rogers o'grien F. King Cook, P.E. (1) City of Coppe[[ (1) City of Coppe[[ 1099 JS Our attars and reports are for the exclusive use of the c ant to whom they are addressed and shall not be reproduced except in full without the approval of the testing laboratory. The use of pu,r. na~e m.us,t receive_gut w~ritten app..royal..pu.r lettefs,.and regals_ apply only to the sample tested and/or inspected, and are not m(mcat~ve or me quantmes or apparen[~y ~oennca~ or s~m,ar prouuc[=. TECHNOLOGIES INC ,~axim Tech.. Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 CLIENT: PROJECT: SERVICES: REPORT OF STRUCTURAL STEEL INSPECTION Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 CUENT NO.: 3200037 REPORT NO.: 25621 Gulf Bearing DATE OF SERVICE: 9/30/95 Coppell, Texas AUTHORIZA~ON: Joe White REPORT DATE: 10/11/95 Perform structural steel inspection as detailed below. REPORT OF INSPECTION Drawings Utilized: Locations/Items Inspected: Discrepancies/Comments: Structural Steel See below. Roof level metal decking installation and screw attachment to support, also at side laps between column lines A to D and 8.8 to 10.6. Workmanship was visually determined to be complaint. Time: 6:30 am to 10:30 am Technician: Randy Walcker~ NDE-Level II ~'~' Report Distribution: MAXIM TECH.~ST, ERN (1) Gulf searing, [nc. (1) Gromatzky, Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers 0'Srien F. King Cook, P.E. (1) City of CoppetL ~0~19)jsCity of Copper[ Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be.[epr.oduced except In fu I without the approva. I of the.testip, g la. boratpry: The use o.f pu~r, na.m...e m.us.[_re_c.~l_v~e~?_r _wt. ~_e_n_.a_p_~p,r..o :v~.l_.~,_u~.[ I..e. tt.e,r_s~.nd...r~e.p,o,~s~ apply only to the sample testea anD/or inspecTeD, an(] are no! no catlve LABS TECHNOLOGIES INC Nlaxim Tech.· Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF STRUCTURAL STEEL INSPECTION CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 25615 DATE OF SERVICE: 9/27/95 AUTHORIZATION: Joe ~ite REPCRT DATE: 10/09/95 SERVICES: Perform structural steel inspection as detailed below. REPORT OF TESTS Drawings Utilized: Locations/Items Inspected: Discrepancies/Comments: Structural Steel Roof level framing. The following items were inspected at this time. * Reinspection of anchor bolt between column lines A to H and 1 to 7. The following columns were found to have loose nut or missing flat washers. A. At column B-2 B. At column B-5 C. At column B-6 D. At column D-3 E. At column D-5 F. At column G-2 4 loose nuts 2 loose nuts 3 loose nuts 4 loose nuts 4 loose nuts 4 loose nuts and no flat washers 3. 4. 5. Joist seat and girder seat welds between column lines A to H and 7 to 9, visually determined to be compliant. Joist bridging between column lines A to H and 7 to 9, visually determined to be compliant. bolted connections at column cap plate to joist girder between column lines A to H and 7 to 9, bolts installed and determined to be compliant. * Metal decking installation and screw attachment to joist supports and side laps. Between column lines A to H and 7 to 7.9, 13 locations were found to be non-compliant. Spots were marked with red paint. Time: 1:00 pm to 5:00 pm * Discrepancies Technician: Randy Walcker NDE-Level II \~ Report Distribution: (1) GuLf Bearing, Inc. (1) Gromatzky, Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers O'Brien (1) City of CoppekL (1) City of CoppekL 1099 JS Our letters and reports are for the exclusive use of tt~e client to whom they are addressed and shall not be reproduced except in full w~thout the aol3rova of the tasting la~oratory, l'be use of pu~nar~e rn.us~ recmve...pur wt. rtten apply only to the sampte tested and/or inspecte~l, and are not incl~catlve ol the quan~l[le$ PT apparenuy Ioentlca~ or 51rn~ar pro , . MAXIM TECH.,S~~. No LABS F. King Cook, P.E.