Loading...
Gulf Bearing-LR 950912TECHNOLOGIES lNG Maxim T®ch.e Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224~27 Dallas, Taxis 75222 Telephone: (214) 631-2700 FAX: (~14) REPORT OF IN-PLACE DENSITY CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 30252 DATE OF SERVICE: 9/06/95 AUTHORIZA33ON: REPORT DATE: 9/12/95 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. CONTRACTOR: Rogers O'Brien TEST OF: Outside & inside perimeter backfill METHOD OF TEST: DENSn'Y: ASTM D2922 MOISTURE: ASTM D3017 PROJECT DATA MATERIALS 23525 Dark broom clay MOISTURFJDENSrFY RELA~ONS OP3qMUM MAXIMUM MOISTURE % DENSrrY oc~ 21.5 99.0 23937 Tanntsh bwn clayey sand 10.5 123.5 SPECIFICA3qON DENSrrY: 95% Dry Density MOISTURE: NA TEST NO ~OCATION 1. 75' S. of N. and outside peri- meter wall, 1st lift. 2. Center of outside perimeter wall, 1st lift. 3. 50' N. of S. end outhside perimeter wall, 1st lift. 4. 60' N. of S. end inside peri- meter wall, 1st lift. REPORT OF TESTS FIELD OPTIMUM FIELD MA~MUM MOISTURE MOISTURE DENSFrY DENSrFY DENSrrY (%) (%) (Pcf) (Pcf) ~ maxi 23.0 21.5 95.8 99.0 97 19.9 21.5 97.9 99.0 99 24.0 21.5 95.0 99.0 96 11.0 10.5 117.9 123.5 95 Report Of Tests Continued On Page 2 1007 JS Our le~ers and repor~ are for the .exclus, lve use of_the client .to whom they .are ad. dressed ~ sh~l not .be rapr.o~,.uced ex. ce~t In. full wffho[A the approval o,f th, e .tesa,n.g la. Doratory.. Ir~, use o! pu,.rna,m.e apply only to the sample ~esTea ano/or inapectea, ano are not inu~cauv~ oTme quorums= Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 9/06/95 REPORT NO. 30252 PAGE 2 REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NQ [~OCATION (%) ~A) ~Pcf) (Pcfl ~A maxi 5. 70' S. of N. end inside peri- meter wall, 1st lift. 10.9 10.5 118.8 123.5 96 Test results on this report meet project specifications as noted on page 1. Technician: Johnny Andrews Started: 08:30AM Stopped: ll:00AM Report Distribution: MAXIM TECH.~OUTHWESTERN LABS (1) GuLf Bearing, Inc. /~, (1) Groa~tzky, Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers 0'Brian (1) City of CoppeLL 1C~17)~sCity of CoppeLL Our letters an~ reports are for the excl.u$1ve use of_the client.to whom they .are e,ddressed .m~.,d shall not .10e_rePrlOedUCeCl ex, cet~t in. full .wtthqut ti? approvRI, of the_testl,n.g ~a. boratpry.. ~ n.e use o! pu..ma.m.e m.u.s~, recew~...pur v~. men aPpro.v~...uu.r ette,r$..ano rel~.Oq.$ apply only to me sample testen end/or ~nspecTen, an~] are not inolcauve OT ~ne quan~me$ ot el3loarermy ~ermcaJ or $1mtmr proouc~$. TECHNOLOGIES INC Maxim Tech.· Southwestern Labs 2575 Lone Star Dr. · P.O. Box 22422' Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 CUENT: PROJECT: SERVICES: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 Gulf Bearing Coppell, Texas Deck Inspection REPORT OF DECK INSPECTION CLIENT NO.: 3200037 REPORT NO.: 30523 DATE OF SERVICE: 9/11/95 AUTHORIZATION: Joe ~tte REPORT DATE: 9/12/95 REPORT OF INSPECTION On this date a representative Od Maxim/SwL arrived on site for the scheduled afternoon roof deck inspection. The deck placement had been delayed over the week-end and was not ready for inspection. Maxim/Swl was not notified of the delay. Technician: Jacque Halverson CME Technician..~~ Report Distribution: '" (1) Gulf Bearing, Inc. (1) Gromatzky, Oupree & Associates MAXIM TE~LABS (1) Brockette, Davis, Drake (2) Rogers O,Brien ~/.,.Jacque Halverson (1) city of CoppeL[ CME Technician Our letters and reports .are for the ..excl.us. lve yse of_the client .to whom th~¥_?_e__a_d,.d, re_s?..ed.._an_d__s~__/.n_o.t_,be ~,e,~r~o~d~e~e~c~e~o~r~s full without the approveJ of the testing moora~ory.. ~ n.e use o! ,o_u~r, na~.e- apply only to the sample tested and/or inspectea, ann are not mo~Cauv= u, u,= wua, ruuc= ~. ,=~,~,,~,~ ,~,,.,~, ~. ~ r. · TECHNOLOGIES INC Maxim Tech. · Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dalhs, Tm~as 75222 Tek, hone: (214) 631-2700 FAX: (214) 920-1891 CUENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas REPORT OF PRE-ROOFING CONFERENCE CLIENT NO,: 3200037 REPORT NO.: 30390A DATE OFSER~CE: 9/07/95 AUTHORIZA~ON: ongoing REPORT DATE: 9/10/95 SERVICES: Pre-Roofing Conference REPORT OF INSPECTION On September 7, 1995 representatives of Roger O'Brten, GDA, CEI and Maxim Technologies met to review the roofing of the above referenced project. The following items were addressed: 1. Safety a. OSHA requirements b. No Smoking on the roof. c. Safety meetings on Tuesday or Wednesday's d. Roof access will be a stair tower on the south side of the building. 2. Daily trash removal will be required. 3. Material Storage a. Do not overload roof. b. All material to be raised and protected from the elements. 4. Scope of Work a Inspect parapet nailers for compliance. Panel seams to be caulked prior to roof placement. Wood blocking is to be flush with the deck. Additional blocking at scuppers. Scupper to be 2" above the drain. No cants or tapered will be used at wall perimeter. Membrane corners will be fabricated in-field. Deck inspection scheduled for 9-11-95 Report Of Inspection Continued On Page 2 1099 JH Our letters and reports are for the excl.us, lve use of_the client .to whom they .are ad. dressed .an~d shall not .be _rep~,od~ucecl ex~c_e~?_ full without the_approv~.l of the.tesfl,n,g la, oorat.o~., inp use ~ pub.ma.m, e m~s.~ re_c.e.l_ve~_o~r_ _wt. ~_e_n__a_l~[vO~.~_~_,r ~seTmSl~rO. rr~o~uc~ apply only to me sample testea ano/or inspec[eo, aha are not inolc~i3ve OTale Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OFSER~CE: 9/07/95 REPORT NO. PAGE 2 30390A REPORT OF INSPECTION Cco. tin~d) h. Roof placement to begin 9-12-95 (tenative) t. Firestone EPDM membrane to be placed, per manufacturers specifications. J. 1-90 wind up-lift pattern to be used during insulation placement. 5. Maxim will be responsible for vtual examination of roof placement and the reporting of the same. 9 - 2 hour spot checks, 1 4 hour punch list inspection and 1 3 hour final inspection will be performed during the estimated 5 weeks of roof placement. 6. A hand written field report will be left on-site with Roger O'Brien representatives at the end of each inspection. Copies of the completed report will be faxed to GDA, CEI and Roger O'Brten the following day of inspection. Any deficiencies will be reported immediately to the roofing foreman, Roger O'Brien and GDA. Technician: Jacque Halverson CME Technician Report Distribution: MAXIM TE~N LABS (1) C,u[f Bearing, inc. (1) Gromatzky, Oupree & Associates (1) Brockette, 0avis, 0rake (2) Rogers O'erie. (1) City of Coppe[[ ' ,0~)d~i ty of Our letters and reports are for the .excl.us. lve yse ofthe client ~o whom they .are ad. dressed ~ shall not .be _reprl~.tueced _eX~Cr?° full v,at~out the al0proval of the tesa..ng mooratory: ~n.e use o! pu.r. na.m. e mg~[ rece~v~..gur _.wry_ en __a~l~_.[o,~_.~,_u~_f apply or~y to the sample tested ancl/&r Insaecte<], ano a~e not ~n~caave o~me quarm~es o[ al3parermy ~oen~c.m or a,m~mr pr~u . TECHNOLOGIES INC Maxim Tech. e Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dal~, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF IN-PLACE DENSITY CUENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CUENT NO.: 3200037 REPORT NO.: 30354 DATE OF SERVICE: 9/08/95 AUTHORIZA33ON: ongoing REPORT DATE: 9/12/95 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. PROJECT DATA MOISTURE~ENSFFY RELA33ONS CONTRACTOR: Rogers O'Brien OFfiMUM MAXIMUM MATERIALS MOISTURE % DENSrrY ocr TEST OF: Perimeter backfill 23525 Dark broom clay 21,5 99,0 " " " 25363 ** 12.5 117.5 " " " 23937 Tannish bwn.clayey sand 10.5 123.5 METHOD OF TEST: DENSFTY: ASTb[ D2922 SPEClFICA~ON MOISTURE: AST~[ D3017 DENSrrY: 95Z Dz7 Density MOISTURE: -12 to +42 opt. REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSFrY DENSflY DENS/P( NO LOCA~ON (%) ~) (P~ (P~ ~ max) 1. Building line H/6 outside, 2nd lift. 23.8 21.5 98.8 99.0 100 2. Building line H/3 outside, 2nd lifu. 21.0 21.5 98.7 99.O 100 3. ~utlding line E.5/1 outside, 1st lift. 11.9 12.5 108.2 117.5 92 4. Building line D/1 outside, lift. 12.3 12.5 108.9 117.5 93 Report Of Tests Continued On Page 2 1007 JS Our letters and reports are for the exclusive use of_the client.to whom they .ere ad. dressed .a~..d sh~l not .be reDr.o.d, uced ex. cept In. full .wffho.~ the_agprovN, o~ ~.e .testl.ng ~.borat?~/.. ~n.e use o! .ou[.na.m.e m~.~. recewe...our .wn~en a~D..roy~,, ..u~. m~m.s..ana re~o~ e~3ply amy to me sample ~estea analor mspec~ea, eno are no~ ma,caave o~ me quammes ot akoparermy ~aenacaJ or $~m~mr proaucm. Gulf Bearing, Inc. REPORT NO. CLIENT NO. 3200037 PAGE 2 DATE OF SERVICE: 9/08/95 30354 REPORT OF TESTS CCon~inued) FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO ~OCA~ON ~) ~) (P~ (P~ ~ max) 5. ~uilding line H/3.5 inside, 1st lift. 11.4 10.5 118.2 123.5 96 6. ~utlding line E.5/1 inside, Lst lift. 12.0 10.5 103.2 123.5 84 * 7. Building line D/1 inside, lift. 14.0 10.5 104.3 123.5 84 * An asterisk (*) appears next to test results which do NOT meet the project specifications as noted on page 1. ADDITIONAL COMMENTS: ** Reddish brown clayey sand with some dark bro~r~ clay. Technician: Alan Spilles Started: 09:00AM Stopped: ll:00AM Report Distribution: MAXIM TE~N LABS (1) GuLf Bearing, Inc. (1) Grm~tzky, Dupree & Associates (1) Brockette, Davis, Drake (2) RoGers O'Brien (,) c,,y of co .tt · Our letters and reports are for ~e .exclusive use of_the client .~o winom t~ey .are ad. dressed ~ shall not .be ~repr..o(ju. ced ex. ce~t In. full .wiflnout the. approvaJ of t~e_tesu..ng I,at)oratgry: in.e use o! .o ..uEna.m.e mgs3 rece~v~..pur .wr~en al~3~y on~/ ~o me sample tested anD/or inspecteD, ano are no~