Loading...
Gulf Bearing-LR 950905TECHNOLOGIES INC Maxim Tech. e Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF MOISTURE-DENSITY RELATIONS CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 29953 DATE OF SERVICE: 8/30/95 AUTHORIZATION: ongoing REPORT DATE: 9/05/95 SERVICES: Obtain sample of material used for construction, prepare samples and perform moisture-density relations test to establish the maximum density and optimum moisture of the material. CONTRACTOR: Rogers O'Brien TEST FOR: Proposed select fill MATERIAL: See additional comments METHOD OF TEST: ASTM D698, Method A ASTM D4318, Proc. A PROJECT DATA DATE SAMPLED: 8/30/95 SAMPLED BY: Arthur Etherly III, GET SAMPLE LOCA~ON: Sampled from the project site stockpile. Dry Dens. (pct) 135 131 127 123 119 REPORT OF TESTS SPECIFIC GRRV1TY 2.65E 11 13 15 17 5 7 MAXIMUM DENSITY, PCF: 126.0 OPTIMUM MOISTURE (%): 9.5 LIQUID LIMIT: 21 PLASTIC LIMIT: 13 PLASTICITY INDEX: 8 E - Estimated Value REQUIREMENTS Range 5 - 15 MOISTURE CONTENT (%) Comments: Soil description: Tannish red clayey sand with some gravel Technician: Charles Shurtleff Report Distribution: MAXIM TECH.~OUT W~H STERN (1) Gulf Bearing, Inc. (1) Gromatzky, Dupree 8, Associates (1) Brockette, Davis, Drake - (2) Rogers O'Brien (1) city of coppett F. King Cook, P.E. 1) City of Coppel[ 10~6 MDR Our letters and reports are for the exclusive use ofthe client.to whom they are addressed .m~.~d shall not .be .[reproduced ex. cept in full .witho. ut.the_approvaJ of the.testing I.aboratory.. ~ n9 use o! pu..rr~.m, e m~s..t receive..our w~. n~en approym.. _.uu.r letters..ana rep. or~.s apply only To me sample testea and/or inspecteD, ana are no! ~na~ca~ve ozzne quanTJt~es o~ apparemly laemlCal or similar proouczs. LABS TECHNOLOGIES INC Maxim Tech.· Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: Gulf Bearing, Inc. Attn: Ross Ramsey 501 Industrial Blvd. Grapevine, TX 76051 PROJECT: Gulf Bearing Coppell, Texas CLIENT NO.: 3200037 REPORT NO.: 28381 DATE OF SERVICE: 7/31/95 AUTHORIZATION: ongoing REPORT DATE: 9/07/95 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: Rogers O'Brien CONCRETE SUPPLIER: Lattimore PLANT: 6 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 3- 5" AIR: N/A METHOD OF TEST: ASTM C-39 ASTM C-143 PROJECT DATA CLASS OF CONCRETE: Mix NUmber 16 DATE OF PLACEMENT: 7/31/95 TIME SAMPLED: 05: 19_/~[ BY: Frank Tisdale, CF.T TEMPERATURE ('F) - AIR: 77 CONCRETE: 89 TRUCK NO: 570 TICKET NO: 6020239 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 6" slab-on-grade Line F.8 at 10.4 CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED {days) 1 1 8/07/95 7 i 2 5.00 8/28/95 28 1 3 5.00 8/28/95 28 1 4 HOLD HOLD REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DIAMETER AREA LOAD STRENGTH (in.) (sq.in.) (lbs. force) Ips~ REMARKS ADDITIONAL COMMENTS: * Cylinders were not located. This area to be cored free of a charge for compressive strength should the A/E or owner so desire. We apologize Report Of Tests Continued On Page 2 1001 LW Our letters and reports are for the excl,us, lve use ofthe client .to whom they .are ad, dressed a,.nFJ shall not .be.[repr.od. uced ex. cept Ir~ full .wltho. ut the_approval, of the .testl.n.g m, eoratqry.. ~ n.e use OT pu.r. na.m, e m.u%~ rece~vq,.,our wr. men ap@.roy~..,uu.r ~ette,rs..ana rep~s_ apply only to ;ne sample testeo aha/or inspeczeo, ano are not inolca~lve OT the quanTr~les ov apparently iQenTical or s~ml~ar proaucts. Gulf Bearing, Inc. CLIENT NO. 3200037 DATE OF SERVICE: 7/31/95 REPORT NO. PAGE 2 SET NO. 1 28381 REPORT OF TESTS (Cont~nue~) ADDmONAL COMMENTS for the inconvenience. Also, this technician's billing for time and cylinders to be cred£ted to the client. Technician: Frank Tisdale, CET Started: 04:30AM Stopped: 07:00AM Report Distribution: MAXIM ES,TF, R TECH,~SOUTHW N LABS (1) Gulf Bearing, Inc. (1) Gromatzky, Dupree & Associates (1) Brockette, Davis, Drake (2) Rogers O'Brien (1) City of Coppe[[ ,0~)LWCity of Coppe[I, Our letters and reports are for the excl.us, lve use ofthe client .to whom they .are ad. dressed a. nd shall not ,be _repr.od. uced ex. cept in. fu I without the approva of the testl.n.g ~aooratory: ,ne use o! pu.r. name m.us~_~ rece,y_e.~,o_u_r _wt. F_e_n__a_p~,r..o..v~l.:_flcOca[ ~oert~selrmsil~nr~_/oec~uO~ apply only to the sample tested ana/or nspectea, aha are not irlalca[lve oT me quart,me= o, uppmen[ly I~em[ c p .